火电厂工程施工项目的管理研究
2017-05-05郝彩兰张俊平��
郝彩兰++张俊平��
【摘要】文章从加强火电建设项目的施工技术管理、质量管理、安全管理、成本管理和进度管理等方面入手,对加强火电厂建设施工项目管理措施进行探讨,为提高电力建设工程的施工效率提供理论参考,实现火电厂施工项目管理目标。
【关键词】火电厂;施工项目管理;改进策略
Study on Management of Construction Project of Thermal Power Plant
Hao Cai-lan,Zhang Jun-ping
(China Energy Construction Group Shanxi Electric Power Construction Third LimitedTaiyuanShanxi030000)
【Abstract】This paper discusses the management measures of the construction project of the thermal power plant, and puts forward the theoretical reference for improving the construction efficiency of the electric power construction project from the aspects of strengthening the construction technology management, quality management, safety management, cost management and progress management of the thermal power construction project. Realize the management target of thermal power plant construction project.
【Key words】Thermal power plant;Construction project management;Improvement strategy
1. 引言
火力发电厂是我国电力领域的重要组成,随着近几十年来人们对于用电量需求的不断增加,电力建设项目不断启动。现代的火力发电厂建设,是大机组、大规划容量、高电压、高自动化占主流,投资规模大大增加,大型的基建项目,技术条件复杂,涉及的专业多,建设周期长,是一个十分复杂的系统工程。火电建设项目涉及面广、建设周期长、投资大,具有参与人员多、工期紧、管理复杂等特点,给其工程建设提出了更高的要求,因此搞好火电厂工程施工项目管理具有重要意义。工程由立项到前期工作准备直到征地、五通一平、开工、订货、施工、调试直至移交生产,这样一个全过程需要一批技术和管理力量,来进行严密而科学的运筹。
2. 电力工程项目管理的含义及流程
2.1电力工程项目管理的含义。
工程项目是人类为完成一定的建设任务而进行的有组织的活动,其具有期限性和个别性。所谓期限性是指基于建设的目的性,工程项目都必须在一定期限内完成,而不可能无限期地拖延下去,如一个火电项目从可行性分析到立项、招投标、施工建设、设备安装调试等各环节进行下来往往需要数年、十数年时间,为了尽早投入使用还分为一期、二期、三期工程,每期工程都需要数年时间;……