浅析施工阶段的造价管理

2019-09-02田树宏

科技视界 2019年10期
关键词:支付施工

田树宏

【摘 要】施工阶段相对于项目全过程造价控制的其他阶段来说,其节约投资的可能性有限,但浪费投资的可能性很大。针对施工階段的造价管理,可采取合同分析、优化进度款支付方式、预防控制工程变更与索赔,提前介入结算等措施,有效控制工程造价。

【关键词】施工;合同;支付;造价

中图分类号: TU723.3文献标识码: A文章编号: 2095-2457(2019)10-0173-002

DOI:10.19694/j.cnki.issn2095-2457.2019.10.074

Analysis of Cost Management in Construction Stage

TIAN Shu-hong

(Sanmen Nuclear Power Co.,Ltd.Project Control Dept.Taizhou Zhejiang 317112,China)

【Abstract】Compared with other stages of the whole process cost control of the project,the possibility of saving investment is limited,but the possibility of wasting investment is great.In view of the cost management in the construction stage,measures such as contract analysis,optimization of payment methods for progress payments,prevention and control of engineering changes and claims,and early intervention in settlement can be taken to effectively control the cost of construction.

【Key words】Construction;Contract;Payment;Cost

0 引言

施工阶段是项目实施的主体阶段,是资源集中投入的阶段。施工阶段时间长,工程变更、索赔和不可抗力等因素的存在,使得造价管理难度加大。通过分析该阶段造价控制的难点,提出有效的措施,有效降低项目成本,提高项目的投资效益。

1 重视合同分析与宣贯

根据需要针对一些大型合同作合同分析,并组织集中学习与宣贯。合同分析可以有效降低项目各方沟通成本,提高管理水平,主要体现在以下几方面:一是提高合同交底的效率。通过合同查找出主要的合同条款,提高效率。二是减少项目组织机构对造价管理工作的影响。大型项目周期长,项目组织机构人员变更频繁,双方通过合同分析,针对合同条款形成固化清单。三是形成标准化。制定相关计价表格的标准模板,项目参与各方统一执行,降低各方审核的工作量。四是容易形成经验反馈。合同分析过程中发现招投标中忽略的问题,形成影响造价的风险清单,双方及时通过签订变更令或补充协议来加以明确。

2 工程变更和索赔管理

工程变更和……

登录APP查看全文

猜你喜欢

支付施工
后浇带施工技术在房建施工中的践行探索
后浇带施工技术在房建施工中的应用
土木工程施工技术创新探讨
浅析微信红包的产品营销思维
农牧区支付服务环境建设的调查
中国发展跨境电子商务的机遇与对策
如何在高校架设学生洗衣服务系统
关于O2O电子商务模式的探讨
土木工程施工实习的探讨与实践
扶贫村里施工忙