基于BIM技术的工程造价全过程管理

2018-09-19韩立红

价值工程 2018年30期
关键词:全生命周期

韩立红

摘要:随着BIM技术的推广普及,BIM技术在工程造价管理中的应用逐渐成为研究热点。通过深入剖析当前工程造价管理中的弊端,并系统探讨了BIM技术在工程造价管理中的具体应用,凸显出BIM技术在工程造价管理中的优势。借助项目案例,完整的展现BIM技术在实际工作中的应用,为工程造价管理BIM化提供可靠的理论依据。

Abstract: With the popularization of BIM technology, the application of BIM technology in engineering cost management has gradually become a research hotspot. Through in-depth analysis of the shortcomings of current project cost management, this paper systematically explores the specific application of BIM technology in engineering cost management, highlighting the advantages of BIM technology in engineering cost management. With the help of the project case, the application of BIM technology in practical work is fully demonstrated, which provides a reliable theoretical basis for BIM of engineering cost management.

关键词:BIM;工程造价管理;协同;全生命周期

Key words: BIM;construction cost management;coordination;life cycle

中图分类号:TU17;TU723.3 文献标识码:A 文章编号:1006-4311(2018)30-0084-03

0 引言

BIM(Building Information Modeling),即“建筑信息模型”,其核心是将建设工程项目信息化、模型化,从而为工程实施的各阶段、各利益相关方的建设活动提供各种与建设产品相关的信息,实现整个建设项目全生命周期各阶段、多要素的集成以及各利益相关方的协同工作平台[1]。

近年来,工程项目建设步伐加快,建筑结构趋于复杂、建设规模庞大、技术难度提高,工程造价昂贵,推动工程造价信息化、集成化、协调化的呼声越来越高[2]。BIM技术因拥有从规划、建造到运营管理,整个全生命周期内实现可视化、共享性、完整性的优势,所以在工程造价的全过程控制中备受关注,BIM模型实现与工地现场情况动态对比,尽早发现项目在施工现场当中的错、漏、碰、缺等问题,对提高工程造价的全过程控制、降低工程成本、提高效益等方面,有其他技術无法比拟的优势。

1 当前工程造价管理中的弊端

1.1 难以实现全过程造价

工程造价的控制贯穿于项目建设全过程,包括估算、概算、预算、合同价、结算和决算。……

登录APP查看全文

猜你喜欢

全生命周期
基于BIM技术的建筑装饰工程造价控制探讨
基于绿色建筑的全生命周期造价管理探究
全生命周期视角下基础设施类PPP项目利益相关者分析
绿色建材全生命周期的研究与落实方法
电力安全工器具的全生命周期管理
BIM—BLM技术发展及其应用研究
全生命周期成本管理在油田企业物资供应中的分析
研究铸造设备动态维修实践工作
全生命周期计价在建筑企业项目成本管理中的运用研究