BIM技术在地铁工程中的应用研究
2023-06-07冯小江娄运达刘洋周真真
冯小江 娄运达 刘洋 周真真



摘 要:【目的】为了解决传统地铁施工信息化程度低,建模效率低的问题,研究建筑信息模型技术在地铁工程中的应用。【方法】本研究利用BIM技术,建立西安地铁八号线某标段模型,实现地铁模型的参数化设计。【结果】利用Revit二次开发技术,提高了地铁模型在Revit中的构建效率,完成地铁模型BIM技术交底。优化地铁施工场地管理,使得场地规划更加合理。【结论】利用互联网技术,实现了地铁智慧工地可视化关系平台构建,提高了施工管理的信息化水平。
关键词:信息化技术;地铁工程;BIM应用
中图分类号:TU92 文献标志码:A 文章编号:1003-5168(2023)09-0088-04
Abstract: [Purposes] In order to solve the problems of low informatization and low modeling efficiency in traditional subway construction, the application of building information modeling technology in subway engineering is studied. [Methods] In this study, BIM technology was used to establish a section model of Xi 'an Metro Line 8 to realize the parametric design of the subway model. [Findings] The secondary development technology of Revit is used to improve the construction efficiency of subway model in Revit and complete the BIM technical disclosure of subway model. And the technology optimizes the management of subway construction site,making the site planning more reasonable. [Conclusions] By using Internet technology, a visual relationship platform for subway intelligent construction site has been realized to improve the informatization level of construction management.
Keywords: information technology; metro engineering; BIM application
0 引言
BIM是利用數字信息技术实现信息化建筑模型,从而辅助设计施工的一种技术。对于施工企业,BIM技术多用于效果展示、场地规划,施工技术交底等。因地铁属于线性工程,建模相对复杂,故BIM技术在房屋建筑领域应用较多,在城市轨道交通领域应用较少[1]。本研究基于西安地铁八号线某标段工程,利用Revit二次开发技术,研究Revit在地铁项目中的应用,为BIM的全生命周期应用提供参考。
1 工程背景
西安地铁八号线某标段共包含两站两区间,其中芙蓉东路站、芙雁区间及雁新区间由二分部负责施工。芙蓉东路站车站长度为192.28 m,主体结构形式为三层双柱三跨、局部三柱四跨的现浇钢筋混凝土箱型框架结构,共设两组风亭和三个出入口。芙雁盾构区间长1.5 km,线路纵坡形式为单边坡,最大纵坡28%,设两处联络通道。雁新暗挖隧道长0.8 km,线路纵坡形式为单面坡,最大纵坡为26%。……