地铁工程项目前期风险识别与评估
2020-08-31周禹彤
周禹彤
摘要:随着城市经济社会的快速发展,地铁被认为是有效解决大城市交通问题的主要方法之一,地铁工程建设投资规模大、安全风险多、建设周期长、对公众社会影响复杂,地铁工程建设风险管理值得高度关注与重视。本文以基于地铁工程项目前期管理目标和工作内容分析,识别了地铁工程项目前期主要风险因素,并对地铁工程项目前期风险因素进行单因素评估和综合评价,以天津地铁6号线前期风险管理为例,剖析了前期风险管理,提出来改进地铁前期风险管理的机理对策。
Abstract: With the rapid development of urban economy and society, the subway is considered to be one of the main methods to effectively solve the traffic problems in big cities. Subway engineering construction has large investment scale, many safety risks, long construction period, and complex impact on the public society. The risk management of metro engineering construction deserves great attention. Based on the analysis of the preliminary management objectives and work content of the subway project, this paper identifies the main risk factors in the early stage of the subway project, and conducts a single-factor assessment and comprehensive evaluation of the early stage risk factors of the subway project. Taking the preliminary risk management of Tianjin Metro Line 6 as an example, it analyzes the early stage risk management and puts forward the mechanism and countermeasures to improve the early stage risk management of subway.
关键词:地铁;前期;风险;识别;评估
Key words: subway;early stage;risk;identification;evaluation
中图分类号:U231.3 文獻标识码:A 文章编号:1006-4311(2020)24-0039-02
0 引言
结合天津地铁6号线前期风险管理的实践经验,根据国内外风险管理的理论与实践,基于地铁工程项目前期管理目标和工作内容分析,识别了地铁工程项目前期主要风险因素,并对地铁工程项目前期风险因素进行单因素评估和综合评价,剖析了前期风险管理,提出了改进地铁前期风险管理的机理对策,以提升地铁工程项目前期风险管理的有效性。
1 地铁工程前期管理工作目标与工作内容
1.1 地铁工程项目前期管理目标 随着我国国民经济的发展,城市载体的日益扩大,现有的交通体系已经不能满足城市的发展及居民出行的需要,地铁作为运载力大、运输快捷就像雨后春笋一样在各大城市竞相展开。但是地铁工程项目是一个相对系统且庞大的工程项目,在这个项目中前期项目管理对于整个地铁项目的顺利实施有着重要的意义,地铁前期工程是地铁工程的不可分割的一部分。……