APP下载

炳灵水电站调速器导叶主配拒动信号改造

2017-11-07高庆磊

科技视界 2017年17期
关键词:改造

高庆磊

【摘 要】炳灵水电站是黄河龙青段梯级第十三座水电站,以发电为主,兼有一定的灌溉、供水、发展旅游及改善环境等综合利用效益。由于在甩负荷试验过程中发现,转速大于115%Ne就会误启动事故停机流程,通过反复研究、调整方案,最终解决了误停机的问题,文章主要介绍了解决上述问题的过程及效果。

【关键词】炳灵水电站;主配拒动;改造

中图分类号: TV734 文献标识码: A 文章编号: 2095-2457(2017)17-0092-002

The Technological Remoulding of Bingling Hydropower Station Speed Governor Guide Vane Main Distributing Valve Malfunction Signal

GAO Qing-lei

(Gansu Electric Power Investment Bingling Hydropower Development CO,LTD.Yongjing Gansu 731600,China)

【Abstract】Bingling hydropower station is the thirteenth one of the cascade hydropower stations in the Yellow River Longqing section.It is a generation-based hydropower station,with irrigation, water supply,tourism development and environmental improvement functions.During load rejection test process,it is found that if the speed is greater than 115%Ne,accident shutdown process will be started wrongly.After repeated research and program adjustment,the paper has given the solution to this problem and the implementation effect.

【Key words】Bingling hydropower Station;Main Distributing Valve malfunction;Technological remoulding

0 概述及存在的問题

炳灵水电站位于甘肃省永靖县炳灵寺石窟上游的黄河干流上,是一座总装机容量240MW的中型水电站,是黄河龙青段梯级第十三座水电站,电站以发电为主,兼有一定的灌溉、供水、发展旅游及改善环境等综合利用效益。平均年发电量9.74亿kW·h,水轮发电机采用5台单机容量为48MW的灯泡式贯流水轮发电机组。

水轮发电机组的过速事故的危害是非常大的,过速的时候巨大的离心力可能会造成机组的振动、摆度急剧增大,甚至有可能会使得机组转动部分与固定部分碰撞,造成水轮发电机组严重损失。为了防止机组过速事故发生,炳灵水电站设置了三级过速保护:转速大于115%Ne且主配拒动,转速大于160%Ne,机械过速(图拉博过速保护装置),三级保护都会通过水机保护回路启动事故停机流程。

一级过速保护:机组转速大于115%额定转速且主配拒动。正常甩负荷的情况下,调速器会通过主配控制导叶开度使机组转速进入空转态。而只在转速大于115%Ne且主配未正常动作的情况下,才会通过水机保护回路启动事故停机流程。……

登录APP查看全文

猜你喜欢

改造
安全型时间继电器常见故障及解决措施
探讨使用网络终端技术改造小型印刷厂计算机排版系统
京隆电厂脱硝技术改造案例分析
矿井主排水系统的优化设计与改造
江西广电网络设区市数字电视备份平台改造方案
电力系统水轮发电机调速器的改造探讨
杭州“城中村”改造的调查
富力煤矿新建南部风井优化通风系统技术分析
对高层建筑结构加固改造的相关问题分析
300MW机组顶轴油系统改造