客运专线长大隧道高压进洞供电施工技术

2017-03-18范平

价值工程 2017年5期

范平

摘要:在长大隧道施工中,根据施工组织安排,如何合理、周密考虑隧道施工中的电路布置是隧道施工中的重点之一,也是确保隧道正常施工的关键。随着开挖进尺增加,供电线路增长,电源压降增大,原电压进洞供电方式已不能满足洞内施工用电要求。结合西成客专大秦岭隧道洞内供电实践及用电分析,提出高压进洞方案及洞内变压器、高压电缆铺设等技术方案,为长大隧道施工的用电方案提供参考。

Abstract: In the construction of long and large tunnels, it is one of the key points to arrange the circuit in the tunnel construction properly and rationally according to the construction organization, and is also the key to ensure the normal construction of tunnels. As the drilling depth increases, power supply lines grows, and power voltage increases, the original voltage entering tunnel power supply method has been unable to meet the construction requirements of electricity within the cave. Combined with the practice of power supply in Great Qinling Tunnel of Xicheng passenger dedicated line, this paper puts forward the high voltage inlet scheme, transformer scheme and high voltage cable laying scheme, so as to provide reference for power supply method in the construction of long tunnel.

关键词:长大隧道;高压进洞;供电

Key words: long tunnel;high voltage inlet;power supply

中图分类号:U455.4 文献标识码:A 文章编号:1006-4311(2017)05-0131-04

0 引言

隧道施工中,隧道中的大功率的用电设备(如空压机、轴流风机、射流风机、砼输送泵、水泵、三臂凿岩台车、混凝土湿喷机、多功能钻机、电焊机等)都会用电。但随着隧道开挖进尺增加,供电线路越来越长,电源出现较大的压降,洞内工作面供电出现不足,而进尺越增大,供电不足现象越严重,并严重影响隧道工程施工的正常进行。

对长大隧道而言,设计合理、经济、实用性的洞内供电方案,配置相应的供电设备是实现特长大隧道快速正常施工的重要保障之一,同时隧道长距离施工供电技术也是控制特长大隧道施工的技术难题之一。

1 工程概况

大秦岭隧道全长14845.99m(中铁十七局集团段承建出口段9921.99m),为长大隧道,该隧道为西成客专铁路控制性工程,属于高风险隧道;该段隧道并设置两座辅助坑道辅助施工正洞,为2号斜井及出口平导;2#斜井位于线路右侧DgK91+360处,全长1746.59m,为双车道,施工完后作为避难所,进入主洞后進行双向开挖,往西安方向开挖903米,往成都方向开挖2317m;……