APP下载

胶带机漏斗的优化与改造

2014-04-29储广旭

中国机械 2014年20期

储广旭

摘 要:针对白马铁矿胶带运输系统中各矿石转载点的原漏斗结构不合理,漏斗磨损较快、漏斗磨穿撒料、预埋混凝土钢制漏斗钢板磨穿及漏斗堵料等情况,充分运用料打料的原理对各漏斗分别进行了优化和改造。在改造中,通过优化漏斗溜槽角度,采取安装挂式衬板、方钢衬板及形成料打料积料槽等方法,较好的解决了漏斗在使用中面临的上述问题。

关键词:胶带机;漏斗优化与改造;料打料原理;积料槽

Abstract:contrary to Baima iron ore tape transport system of each Ore transfer station funnel structure is not reasonable,Funnel wear too fast ,Funnel wear out and Leakage of material Embedded steel plate mill funnel wear of concrete and the funnel wall material, and so on and so forth , Fully using the principle of a material to each funnel is optimized and transformation . In the process of transformation, By optimizing the funnel chute Angle, take the installation hanging plate, square steel plate, and The formation of material stacking groove etc, better solved the funnel in use of the above problems.

Keywords:Belt conveyor ;Funnel optimization and improvement;  A material principle; Stacking groove

1.白马铁矿胶带机运输的供矿条件及产品粒度

1.1供矿条件:采场采出的矿石由汽车运输至破碎站并自卸到翻卸矿仓内,矿石粒度1200-0mm。

1.2产品粒度:将1200-0㎜的矿石经C160鄂式破碎机破碎至300-0mm,经胶带机输送到选厂半自磨机。

1.3矿石性质:物料块度350-0㎜,矿石松散容重:2.125t/m3,松散系数1.6,小于250㎜以下矿石含粉率约为30%的钒钛磁铁矿。

2.白马铁矿胶带机输送系统概况

2.1白马铁矿胶带运输系统承担着年输送850万吨的铁矿石运输任务,由2台破碎机,13条胶带机、7个转运站外加2个干选转运站、4个变电所外加两个移动变电所组成。主胶带运输系统工艺流程图如图1所示:

图1  白马铁矿胶带运输系统工艺流程图

2.2整条胶带机系统有18个漏斗,由于原配套的漏斗结构不合理,不能适应生产达产的需要。在主胶带系统运行时,出现漏斗磨穿,堵料等情况,严重制约了产能的发挥,影响了主胶带系统的正常运行和生产。

3.胶带机漏斗的加料

3.1向胶带机漏斗加料需考虑许多方面,其中最重要的是应通过漏斗将物料装载到下条受料胶带机的中央,物料沿胶带机运行方向的速度尽可能和胶带机的运行速度相等。……