浅谈水利工程造价控制

2012-06-04黄静

城市建设理论研究 2012年13期
关键词:全过程造价

黄静

摘 要:水利工程全过程造价控制是一个动态控制造价的过程,它贯穿于项目的全过程,即项目决策、项目设计、项目实施和竣工验收等阶段。对水利工程造价进行一体化管理,抓住水利工程造价控制要点,实现工程投资控制在批准的概算内的控制目标,这是全过程造价控制的最终目的。

关键词:水利工程;全过程造价;控制目标;控制要点

Abstract: The whole process cost control of the hydraulic engineering is a dynamic process of cost control; it runs through the whole process of the project, which means project decision-making, project design, project implementation and completion of the acceptance stage. Integrated management of water project cost, to seize the water project cost control points to achieve the project investment control of the control objectives within the approved budget, which is the ultimate purpose of the whole process of cost control.Key words: hydraulic engineering; the cost of the whole process; control objectives; control points

中图分类号:TU723.3 文献标识码:A文章编号:2095-2104(2012)05-0020-02

全过程造价控制是业主、承建商、监理单位、咨询公司(或代业主)间的互动的服务与管理活动。管理的深度与精度来自项目的特点与业主的要求,管理的推进与完善来自项目各实施方的配合与监督,服务的质量来自咨询公司的人员素质与组织架构。整个过程应以以下思路展开:

1控制目标

确保投资控制在批准的项目设计概算内。

1.1 控制原则

建立以设计阶段为重点的建设全过程的造价控制流程。实行主动控制、动态跟踪、链状台帐的管理手段。

1.2 目标分解

1.2.1 主动控制

每一阶段都有一个造价管理方案,因应工程进度组织业主相关部门、监理与总包单位协调方案的实施与修正。

1.2.2 动态跟踪

因应不同的招标阶段、设计深化程度、施工完成情况,对材料价格、合同造价、变更价款予以询价、计量、修正等工作。

1.2.3 链状台帐

以合同管理为核心,形成招标与采购、合同与支付、变更与结算等链式数据库。

2 造价控制内容

全过程造价控制根据不同的阶段分别完成不同工作,各项工作虽相对独立,但应考虑连贯性。……

登录APP查看全文

猜你喜欢

全过程造价
全过程造价在政府投资项目工程管理中的有效应用初探
浅析建筑工程管理中的全过程造价控制
试析建筑工程管理中的全过程造价控制
解读建筑工程管理中的全过程造价控制措施
BIM技术在公路工程全过程造价风险管理中的应用
探析建筑工程管理中全过程造价控制
建设单位工程项目全过程造价管理与控制策略分析
探析现代建筑工程经济管理中应用全过程工程造价的作用与途径
工程项目全面造价管理研究
医院建设项目全过程造价控制管理