隧道工程施工中 高压水平旋喷桩超前支护技术的应用研究
2021-09-22贾良
?贾良



摘 要:针对隧道工程施工过程中富含地下水、围岩稳定性差等导致地表沉降、隧道变形等问题,使用高压水平旋喷桩超前支护技术。此支护的主要特點为可控性强、均匀性强、强度高,将实际工程为例,对高压水平旋喷桩超前支护的施工方式分析。结果表示,使用高压水平旋喷桩超前支护技术,能够避免隧道施工过程中地表沉降的问题。
关键词:隧道工程;水平旋喷桩;隧道超前支护
中图分类号:U455.7 文献标识码:A 文章编号:1001-5922(2021)09-0189-04
Research on Application of Advanced Support Technology of High Pressure Horizontal Jet Grouting Pile in Tunnel Construction
Jia Liang
(Shaanxi Railway Institute, Weinan 714000, China)
Abstract:In order to deal with the problems of surface settlement and tunnel deformation caused by rich groundwater and poor stability of surrounding rock during the construction of tunnel engineering, the advanced support technology of high-pressure horizontal jet grouting piles is used. The main features of this support are strong controllability, uniformity, and high strength. Taking the actual project as an example, the construction method of the high-pressure horizontal jet-grouting pile advanced support is analyzed. The results show that the use of high-pressure horizontal jet-grouting pile advanced support technology can avoid the problem of surface settlement during tunnel construction.
Key words:tunnel engineering; horizontal jet grouting piles; tunnel advance support
目前,旋喷桩被广泛应用到建构筑物地基基坑、沟槽边坡支护的设计施工中。在使用过程中,旋喷桩为垂直竖向施工,对于软弱底层、边坡底层具有加固稳定、防止流土流砂、止水等作用,还能够作为建构筑物与人工处理地基的桩基础。在设计隧道工程中,根据隧道外围水平方向使用旋喷桩技术工艺。在隧道工程设计施工过程中,根据隧道外围水平方向使用超前支护与隧道软弱围岩实现止水加固比较少见,为新型设计施工手段[1]。以此,本文就对隧道工程施工中使用高压水平旋喷桩超前支护技术进行分析。
1 工程实例
某隧道工程全长5.5km,热力干线管径为DN1000,全线使用浅埋暗挖隧道方式进行敷设。公安部和大华路段长度为1075m,处于长安街南侧绿化带中,有402m和现况多层楼层相邻,距离楼房6~7m,使用加强隧道断面,拱顶覆土厚度为7~9m。隧道穿越土层为粉细砂、粘质粉土、粉质粘土、中砂层,局部上层滞水,隧道处于地下潜水水位,此地区地下水对于混凝土没有侵蚀性。……