基于全景技术的机车检修接车系统设计
2021-09-10李康民赵万里李哲
李康民 赵万里 李哲





摘要:针对原接车系统拍照上传图集和手记誊抄上传接车文档方式,存在图多零碎查阅困难和接车记录形成繁琐且后续使用困难的问题,提出了新型的设计理念。采用3D建模、全景技术和移动计算,构建了新型接车鉴定工作模式;以3D机车为依托,融合全景图和细节平面图;清单化接车作业;提升了接车鉴定工作效率和质量。
Abstract: Aiming at the problems of the original pickup system taking pictures and uploading the atlas and the handwritten notes uploading the pickup documents, there are problems such as the difficulty of checking multiple pictures and the cumbersome formation of pickup records and the difficulty of subsequent use. A new design concept is proposed. 3D modeling, panoramic technology and mobile computing are used to construct a new model of locomotive pickup appraisal; relying on 3D locomotive, it integrates panoramic images and detailed floor images; inventory pickup operations; improve the efficiency and quality of locomotive pickup appraisal.
关键词:铁路机车;机车检修;接车鉴定;预检作业;全景看车
Key words: railway locomotive;locomotive inspection and repair;appraisal of receiving train;preinspection operation;panoramic view of the locomotive
中圖分类号:U269.322 文献标识码:A 文章编号:1674-957X(2021)11-0153-04
0 引言
机车经过一定时期运行,各部件会发生磨耗、变形或损坏,为保障机车可靠地运行,须有计划地进行检修。依据铁路相关规定,承修单位组织有关人员,会同承验验收室和送车单位代表共同做好接车鉴定记录,并由送车单位代表带回一份记录交机务段[1];接车鉴定是对机车部件进行检查、记录、确认检修要求及拍照存档,记载机车入厂状态和检修要求,对后续检修过程有重要的指导作用。以往做法是一方面通过相机拍摄机车部件,导出后上传原系统,每台份约300余张;另一方面边检查边手记到纸上,然后誊抄入电脑,整理形成接车记录,将文档上传到原系统。主要存在:重复工作多、图片零碎查找难、文档形式传递信息利用难度大;针对以上问题,进行新的设计架构研究,对于提升接车鉴定工作效率和质量有重要意义。
1 系统架构设计
对于接车鉴定工作中存在的问题,本研究设计思路如下:
①对SS4B、HXD1型……
