城市轨道交通工程测量内外业一体化的思考与实践
2021-03-08卢其栋
卢其栋



摘 要:城市轨道交通工程测量传统作业模式的质量比较依赖员工的技术水平及责任心。随着测量机器人、电子水准仪等设备的普及,在移动通信技术的支撑下,测量外业实现记录电子化。测量记录通过移动网络传输至内业,形成内外业一体化的作业模式,有效提高工作效率,降低人力成本,实现了降本增效的目的。
关键词:城市轨道交通工程测量;记录电子化;内外业一体化;降本增效
中图分类号:P258 文献标识码:A 文章编号:1003-5168(2021)36-0090-04
Thinking and Practice on Integration of Office Work and Feild Work about Urban Rail Transit Engineering Survey
LU Qidong
(SGIDI Engineering Consulting(Group) Co.,Ltd.,Shanghai 200093)
Abstract: The quality of the traditional operation mode of urban rail transit engineering survey depends on the technical level and sense of responsibility of employees.With the popularity of measuring robots,electronic level and other equipment,as well as the support of mobile communication technology,the field measuring records are electronic,and the records can be transmitted to the office in real time via the mobile network,forming an integrated operation mode of office work and field work,effectively improving work efficiency,reducing labor costs,and achieving the purpose of reducing costs and increasing efficiency.
Keywords: urban rail transit engineering survey;electronic records;integration of office work and field work;cost reduction and efficiency increase
城市轨道交通是一项规模大、投资高、周期长的系统性工程,建设难度大。受城市规划、周边已有建构筑分布、地质条件等诸多条件的限制及城市轨道交通本身运行性能的要求,线路结构的走向和标高的精度要求较高。工程测量工作的有效性是城市轨道交通结构精确就位的前提和保障,城市轨道交通工程测量具有专业性强、精度要求高、及时性要求高等显著特点[1]。
传统测量作业模式质量过于依靠人工干预,受制于员工技术水平、责任心[2]。任何测量环节出错均导致返工,使测量周期成倍拉长;关键节点的测量验收时返工更会影响工程施工进度[3]。
随着测量机器人、电子水准仪的普及,以及高性能智能终端和移动通信技术的应用,城市轨道交通工程测量内外业一体化的作业模式是提高测量工作效率、降低出错率的有效途径。
1 内外业一体化测量的解决方案
工程测量包括外业测量、内业数据处理两个主要工序。……