世界银行贷款项目执行管理的分析与研究

2018-07-27肖靖炜张小剑

价值工程 2018年17期
关键词:高速公路

肖靖炜 张小剑

摘要: 世界银行(以下简称“世行”)贷款项目的建设周期分为:项目立项、项目准备、项目评估、项目谈判、项目执行与监督、项目后评价六个阶段。项目执行管理是项目管理的一个重要组成部分,管理的好与坏将直接关系到项目的成败,项目执行管理覆盖项目整个执行期。本文以世行贷款项目湖北宜巴高速公路为例,重点阐述世行贷款项目执行管理与监测评价这一套行之有效的制度,可供我国工程建设投资管理借鉴。

Abstract: The construction period of the World Bank loan project is divided into six phases: project approval, project preparation, project evaluation, project negotiation, project implementation and supervision, and post-project evaluation. Project execution management is an important part of project management. Good or bad management will directly affect the success or failure of the project. Project execution management covers the entire implementation period of the project. This paper takes the Hubei Yiba Expressway which belongs to World Bank loan project as an example, focuses on the effective management and monitoring evaluation system of the World Bank loan project, which can be used for reference in China's engineering construction investment management.

關键词: 中国项目;世界银行贷款;高速公路;项目完工;后评价

Key words: China project;World Bank loan;expressway;project completion;post-evaluation

中图分类号:F831 文献标识码:A 文章编号:1006-4311(2018)17-0057-02

0 引言

世界银行成立于1944年,截止目前有189个成员国,员工来自170多个国家,在130多个地方设有办事处。世界银行集团是一个独特的全球性合作伙伴,所属五家机构共同致力于寻求在发展中国家减少贫困和建立共享繁荣的可持续之道。世界银行总结半个多世纪的项目贷款管理经验,坚持经济、有效、透明、的采购政策,在工程、货物、咨询服务的采购方面制订出一套成熟和完善的行为规范。

2015年,笔者全过程负责编写世行贷款项目湖北省宜昌至巴东高速公路(以下简称“宜巴高速”)项目完工报告及项目后评价。宜巴高速全长173.6km,项目总投资151.4亿元,世行贷款额为1.5亿美元(2008年折合人民币10.5亿元,占项目总投资的6.9%),剩余资金由国家资本金与国内银行贷款共同解决,宜巴高速地质条件差,技术难点多,地域特色明,环保要求严,建设难度大,管理要求高。……