APP下载

基于BIM技术的人工挖孔扩底桩稳定性控制方法

2018-04-10谢童安罗丽荷

价值工程 2018年11期
关键词:BIM技术

谢童安 罗丽荷

摘要: 人工挖孔扩底桩属于埋置较深的地下隐蔽工程,其施工技术存在较大的危险性,故而加强对人工挖孔扩底桩施工过程中的稳定性和安全性控制成为亟需解决的一道难题。本文结合实际工程总结了人工挖孔扩底桩稳定性控制的传统方法和特点,提出了基于BIM技术的人工挖孔扩底桩稳定性控制的具体方法及主要内容,阐述了其优势及实施要点,最后对其拓展运用进行了展望。

Abstract: How to control the strengthening of the stability and safety in the construction of the artificial hole dug belled pile is a difficult problem that it needs to be solved urgently, for the artificial hole dug belled pile belongs to the buried deep concealed project, and its construction technique is full of great danger. In this paper, the traditional methods and characteristics of the controlling of stability of the artificial hole dug belled pile are summarized for the comparing, some concrete methods and main contents of the controlling of the stability of the artificial hole dug belled pile is put forward based on BIM Technology, and its advantages and main points of implementation are expounded, finally the development and application of this method is prosected.

关键词: 人工挖孔扩底灌注桩;稳定性控制;BIM技术

Key words: the artificial hole dug belled pile;the controlling of stability;BIM(Building Information Modeling)

中圖分类号:TU758.11 文献标识码:A 文章编号:1006-4311(2018)11-0087-03

0 引言

人工地下隐蔽作业存在着大量未知的危险因素,对桩基成孔稳定性和井下作业人员的安危存在较大威胁,若能在施工前就对地下作业环境和施工过程充分掌握,则能大大提高桩基稳定性和质量完整性以及作业人员的安全性[1]。本文从人工挖孔扩底桩的施工稳定性角度出发,结合现有的理论知识和BIM技术对影响桩基施工中稳定性因素做出了解和判断,运用4D技术对桩基施工稳定性控制点做出施工模拟,力求做到事前控制的准确性和及时性,从而提升桩基施工稳定性,从而保证桩基成桩质量和使用安全性;桩基施工的稳定性不仅关乎到桩基的完整性和质量是否满足要求,还关系到地下作业人员的安全。

1 工程概况

云南新储物流配送中心综合厂房主体工程,项目位于昆明市经开区洛羊物流片,东临鸿运大道,北接城市绿化带,西临城市主干道,南侧为部队用地。……

登录APP查看全文

猜你喜欢

BIM技术
基于BIM技术全寿命周期工程造价管理的探索
浅谈BIM技术在预制装配式住宅中的应用
基于BIM技术的工程项目投资控制
初探BIM技术在建筑装饰设计课程教学中的应用
基于BIM技术的高职教育土建专业教学改革研究
BIM技术在建筑工程施工中的应用
BIM技术在配套服务用房项目的深化设计及应用研究
BIM技术在钢结构工程设计制造中的应用研究
基于BIM技术的工程项目信息管理模式
建筑施工管理中BIM技术的应用