【摘 要】基于近年来预装变电站的快速发展与广泛应用,本文对预装式变电站免基础系统进行详细设计,提出了一种预制舱安装结构,以降低预制舱安装过程中的土建施工量,提高预制舱的抗风、抗震性能,并从施工工程量、工期、费用几方面进行分析,同时与常规变电站做对比。
【关键词】预装式变电站;免基础
中图分类号: TM63 文献标识码: A 文章编号: 2095-2457(2017)23-0114-002
【Abstract】Based on the rapid development and extensive application of prefabricated substations in recent years, in this paper, the system of free foundation applied in prefabricated substation is designed in detail, and a precast cabin installation structure is proposed to reduce the amount of civil construction in the installation of prefabricated cabin installation process, to improve the wind resistance and seismic performance of prefabricated cabin, and to analyze the construction engineering quantity, time limit ,cost of several aspect. At the same time compared with the conventional substation.
【Key words】Prefabricated substation;Free foundation
0 引言
随着国民经济和社会的快速发展,能源需求越来越大与人力资源紧张,建设工期紧,电网工程质量及工艺要求越来越高等矛盾越来越突出,变电站现有的建设模式已无法适应新的要求。为提高变电站建设效率,一般通过加快变电站施工进度,提高工程质量,变电站建设应采用模块化、标准化、工厂化生产,现场仅进行简单组装等方式解决问题[1-2]。目前国内外许多厂家已有比较成熟的生产设备舱的技术,大多应用于6-35kV配電网中,也有少量厂家生产110kV变电站中二次组合设备用预制舱,但无论是那种预制舱在现场都有一定的工作量,预制舱对地基均有承载要求,均需要有较多的土建施工量[3-4]。
为了减少现场土建施工的工作量,有公司提出定位凹槽与定位凸块相互配合即可实现预制舱的定位安装方式,在预制舱底部的底部板件形成预制舱的底座,底座和舱体构成预制舱,预埋于地面的专用角件形成预制舱的土建基础,预制舱和专用角件形成的土建基础形成预制舱安装结构[5]。……