隧道超欠挖原因分析及控制措施

2017-10-21杨柳耿占勇唐海军

价值工程 2017年32期
关键词:控制措施

杨柳+耿占勇+唐海军

摘要: 在钻爆法掘进隧道时,严重的超欠挖将影响隧道的施工成本和长期安全稳定,然而,钻爆法掘进隧道的超欠挖又是不可避免的,但是通过采取一些措施,可以将超欠挖值控制在一个较小的水平。本文在分析和总结超欠挖产生的原因及其危害的基础上,结合兰州南绕城高速公路建设项目实际,就如何加强隧道超欠挖控制,减少混凝土超方进行了深刻的原因分析且提出了具体对策,以便指导现场施工。

Abstract: In the drilling and blasting excavation of tunnels, serious overbreak will affect the construction cost of the tunnel and the long-term safety and stability. However, it is inevitable on the drilling and blasting excavation of tunnel overbreak, but the overbreak value is controled at a smaller level by taking some measures. The author has analyzed and summarized in the dig over the cause and harms, and made a deep super concrete reason analysis on how to strengthen the tunnel overbreak control and reduce the party by combing Lanzhou south highway construction project, and put forward countermeasures to guide the construction site.

关键词: 隧道;超欠挖;控制措施

Key words: tunnel;over and under excavation;control measures

中图分类号:U45 文献标识码:A 文章编号:1006-4311(2017)32-0170-02

0 引言

在隧道開挖施工过程中,隧道超欠挖现象不可避免,这不仅造成了人力、机械、财力的巨大消耗,而且还降低了围岩稳定性、降低了工程质量,延误了工程进度。有的甚至影响人身安全,超挖部分回填大量混凝土,影响工程的经济效益和社会效益[1]。

因此,严格控制隧道超欠挖是隧道工程施工质量控制及成本控制的重点。

1 隧道超欠挖原因分析

公路隧道超欠挖是以隧道轮廓线为依据,超过开挖轮廓线为超挖部分,侵入开挖轮廓线为欠挖部分,隧道超挖不仅造成弃渣方量增多,增加机械燃料费用,而且增加了衬砌混凝土方量,导致施工成本增加,而且会导致山体围岩应力集中,影响围岩稳定性,为以后施工及隧道运行留下安全隐患[2]。隧道欠挖会导致二衬厚度不足,不满足设计要求,以后整改时会造成巨大人力、财力、物力的浪费。故在隧道施工过程中我们要加强隧道超欠挖控制,减少隧道超挖,杜绝隧道欠挖。……

登录APP查看全文

猜你喜欢

控制措施
给排水工程招投标阶段中的造价控制措施
建筑安装工程预结算造价控制措施
土木工程施工的质量控制措施初探
大型公司财务预算与控制措施探讨
土木工程管理与工程造价的有效控制措施探讨
土木建筑施工质量控制措施探讨
建筑工程招投标阶段的造价控制措施
建筑项目管理的进度控制措施
机电安装在消防工程中的控制措施探讨
电子通信中常见干扰因素及控制措施