【摘 要】黄金坪水电站大坝为沥青混凝土心墙堆石坝,心墙顶高程1480.70m,底高程1405.50m。沥青混凝土心墙是土石坝坝体防渗的关键部位,沥青混凝土配合比的合理性对心墙施工质量起着关键的作用,由于施工前期白云岩骨料人工砂中石粉含量多且波动较大,直接用于工程之中对沥青混凝土配合比调整带来困难,为了有效的控制沥青混凝土施工质量,采取了一系列措施解决了这个工程难题。
【关键词】沥青混凝土心墙 人工砂 配合比控制 黄金坪水电站
【Abstract】Huangjinping dam asphalt concrete core wall rockfill dam, heart top elevation 1480.70m, bottom elevation 1405.50m. Asphalt concrete core wall is a key part of earth - rock dam seepage, rationality core wall construction quality plays a key role in asphalt concrete mix, since the pre-construction dolomite aggregate artificial sand and dust content more volatile being directly used for engineering of asphalt concrete mix ratio adjustment difficult, in order to effectively control the quality of asphalt concrete construction, has taken a series of measures to solve the engineering problems.
【Key words】asphalt concrete core wall artificial sand mixture ratio control Huangjinping Station
1 工程概况
黄金坪水电站拦河大坝采用沥青混凝土心墙堆石坝,坝基覆盖层采用最大深度111m厚度1.2m的全封闭混凝土防渗墙防渗。大坝坝顶宽度12.0m,坝顶长度407.44m,坝顶高程1481.50m,心墙底面高程1396.00m,最大坝高85.5m。沥青混凝土心墙顶部厚0.6m,底部最大厚度为1.1m。
黄金坪水电站沥青混凝土心墙用骨料由康定水泥厂的白云岩毛料经破碎、筛分加工而成,由于白云岩岩性偏软的原因,在破碎加工过程中岩粉含量大,在无任何除尘设备的作用下加工系统生产的细骨料中石粉含量高达35%左右,远远超出规范小于5%的要求,对沥青混凝土配合比控制带来问题。
2 解决方案
黄金坪水电站沥青混合料拌和系统采用西安筑路机械厂生产的LB-1200型沥青混合料拌和楼,该系统安装的除尘装置为两级粉料抽吸设备,分别为一级重力除尘设备和二级布袋除尘设备,其中一级除尘得到粉料细度较粗,二级除尘得到的粉料细度较细。……