摘  要:在大吨位、深基础桩基承载能力检测项目中,自平衡检测法因其试验占地面积小、操作简单等特点,明显更优于传统的桩基静载试验方法。该文通过某站房桩基自平衡法试验检测的工程实例,介绍了自平衡法桩基承载力检测方法的实施过程,对自平衡检测法的工程实际施工步骤进行详细说明,探讨了该技术实施过程中的重点难点,为今后类似工程检测项目提供工程经验。

关键词:桩基础  检测  实例  自平衡法

中图分类号:TU753                         文献标识码:A文章编号:1672-3791(2021)04(a)-0101-04

Analysis on Test Method of Pile Self Balanced Static Load Technology

QIN Lichao  JIANG Chao

(Hunan Technical College of Railway High-speed, Hengyang, Hunan Province, 421001  China)

Abstract: In the large tonnage, deep foundation pile bearing capacity test project, the self-balance test method is obviously better than the traditional pile static load test method because of its small test area,simple operation and other characteristics. This paper introduces the implementation process of the self-balanced pile foundation bearing capacity testing method through the engineering example of the self-balanced pile foundation testing method of a station building,illustrates the actual construction steps of the self-balanced testing method,and discusses the key and difficult points in the implementation process of the technology, so as to provide engineering experience for similar engineering testing projects in the future.

Key Words: Pile Foundation;Test;Example;Self-balance Method

桩基础是一种最常用的基础类型,其广泛应用于各建设项目中。桩基础竖向极限承载力作为桩基工程研究的重要概念,是反映桩身材料、桩侧土与桩端土性状、施工方法的综合指标,因而确定桩基的竖向极限承载力是桩基施工过程中非常重要的步骤[1]。传统的静载试验法检测桩基础承载力,在试验检测过程中操作复杂且作业面积大,尤其是大吨位的单桩竖向静载荷试验,常受场地小或场地表层土土质较软无法提供配重反力等因素影响,无法试验检测。该文采用自平衡法检测桩基础承载力,装置较为简单,仅需占用小片场地施加荷载及采集数据,试桩准备工作省时省心,在桩基检测项目有较大的优越性[2]。

1  工程概况

该工程为广汕铁路新塘站站房相关工程,位于广州市增城区新塘镇站前路以南,环城路以北,规划一路以东,新源路以西,中心里程DK41+150。该次试桩计划为东侧铁路自营停车场4根试桩。……