APP下载

某220 kV内桥接线变电站线路保护改造方案

2021-07-28张鹏

科技资讯 2021年10期

张鹏

摘  要:220 kV内桥接线变电站作为终端变,通常不配置线路保护,靠对侧电源端线路保护切除故障。如果是主变低压侧区内故障,在高压侧开关失灵情况下,对侧保护距离Ⅱ段或Ⅲ段动作,这样主变承受故障电流时间增长。为了实现全线速动,某变电站一回220 kV线路增设双套线路保护。同时为了减小线路开关失灵时短路电流对主变的冲击,线路开关配置失灵保护。在线路保护改造过程中遇到了互感器选型、开关保护选型和操作箱选型等问题,文中给出了处理方案。

关键词:内桥接线  线路保护  复合变比  失灵保护  分相操作箱

中图分类号:TM773                        文献标识码:A文章编号:1672-3791(2021)04(a)-0054-04

A Scheme to Add Transmission Line Relay at a 220 kV Internal Bridge Wiring Substation

ZHANG Peng

(Xuzhou Survey and Design Center of State Power Economic Research Institute, Xuzhou, Jiangsu Province, 221005  China)

Abstract: Usually there is not transmission line relay disposition at a 220kV internal bridge wiring terminal substation. It depends on transmission line protection at the opposite side substation. When a ground fault occurs on low-voltage side,if high-voltage side switch refuses to open,it depends on backup distance protection at the opposite side substation. To improve fast-trip performance and protection the main transformer,two transmission line relays are added at a 220kV substation. Current transformer and voltage transformer selection, failure protection relay selection and operation box selection problems are discussed in this paper.

Key Words: Internal bridge wiring;Transmission line relay;Compound transformation ratio;Breaker failure protection;Single phase operation box

內桥接线方式在110 kV变电站是常见的接线方式。而在220 kV变电站中,有时为了简化主接线,节省投资,往往也采用内桥接线。相对于双母线接线变电站,220 kV内桥接线变电站本身数量少,没有通用设计方案参考。早期建设的变电站往往不能满足国网反措要求,例如:220 kV出线未配置线路保护或仅配置单套线路保护,220 kV线路开关、桥开关未配置失灵保护,220 kV双套保护共用保护二次绕组等。该文对江苏电网某220 kV内桥接线变电站保护配置进行分析,指出存在的问题,给出了改造方案。

1  变电站现状

一期建设2号主变、进线2开关和桥开关,2002年投运;二期扩建1号主变和进线1开关,2006年投运。二期扩建后220 kV部分为内桥接线,户外敞开式布置。220 kV部分主接线如图1所示。

改造前220 kV系统未配置线路保护、断路器保护和母线保护。1号、2号主变配置双套电气量保护和单套非电量保护。……