高压电力电缆施工过程的监理控制方法分析

2021-07-20李文金

今日自动化 2021年3期

李文金

[摘    要]随着经济的高速发展,社会的用电需求不断提升,电力设施的建设需求也越来越大,且随着城市美观的需要,越来越多的高压电缆需要依托电力隧道施工,但电力隧道的施工存在着施工难度大、监理控制难度大、工程质量难以保证的特点。文章以A市220 kV变电站输变电配套110 kV线路工程为例,详细介绍了该工程施工过程中采用的监理控制。

[关键词]输变电配套工程;电缆;监理控制;工程质量

[中图分类号]TM711 [文献标志码]A [文章编号]2095–6487(2021)03–0–02

[Abstract]With the rapid development of the economy, the demand for electricity in the society continues to increase, and the demand for construction of power facilities is also increasing. With the need for urban beauty, more and more high-voltage cables need to rely on power tunnel construction, but The construction of power tunnels has the characteristics of great difficulty in construction, great difficulty in supervision and control, and difficulty in guaranteeing project quality. This paper takes the 110 kV line project of 220 kV B substation in City A as an example, and introduces the supervision and control adopted in the construction process of the project in detail.

[Keywords]power transmission and transformation supporting project; cable; supervision control; engineering quality

以A市220 kV輸变电配套110 kV线路工程为例,详细介绍了施工过程中采用的监理控制方法,最终项目顺利通过验收,各项技术指标均符合设计及施工技术规程规定,其中结构防水的验收合格率得到了显著的提升。

1 A市220 kV输变电配套110 kV线路工程简介

1.1 工程名称

A市220 kV变电站输变电配套110 kV线路工程(B变电站至力源终端场改线部分)。

1.2 工程建设规模

(1)110 kV配套A线线路工程(架空部分):110 kV配套A线线路工程(架空部分)新建线路长0.048 km。导线选用JL/LB1A630/45型铝包钢芯铝绞线,地线选用JLB40-100钢芯铝绞线;新建钢管杆2基,其中双回耐张钢管杆1基,四回耐张钢管杆1基。

(2)110 kV配套B线线路工程(架空部分):110 kV配套B线线路工程(架空部分)新建线路长0.076 km。导线选用JL/LB1A630/45型铝包钢芯铝绞线,地线选用JLB40-100钢芯铝绞线;新建钢管杆2基,其中三回耐张钢管杆2基。

(3)110 kV配套A线线路工程(电缆部分):从新建电缆终端场Ⅰ~新建电缆终端场Ⅱ。新建四回电缆线路长4×3.42 km。A线对应的站点线路为:熙都甲、乙、丙线三回,熙陈线一回,共四回路。……