大型光伏电站EPC总承包项目风险管理研究

2021-01-22赖明峰

今日自动化 2021年12期
关键词:风险管理

赖明峰

[摘    要]我国在大力发展光伏产业下,于国内外诸多地区先后开展了众多大型光伏电站EPC总承包项目,由于受到项目自身特殊性及其承包方式的影响,使得项目无论是在立项阶段还是后期的实施与竣工阶段,均容易出现各种风险问题。因此加强对此类项目的风险管理显得尤为重要,基于此,文章将通过结合具体项目案例,重点针对大型光伏电站EPC总承包项目风险管理进行简要分析研究。

[关键词]大型光伏电站;EPC总承包项目;风险管理

[中图分类号]TM73 [文献标志码]A [文章编号]2095–6487(2021)12–0–02

Research on Risk Management of EPC General Contracting

Project of Large-scale PV Power Station

Lai Ming-feng

[Abstract]Under the vigorous development of photovoltaic industry in China, many large EPC general contracting projects have been carried out in many regions at home and abroad. Due to the influence of the project itself and its contracting mode, the project is prone to both the project stage and the later implementation and completion stage.Therefore, it is particularly important to strengthen the risk management of such projects. Based on this, this paper will focus on a brief analysis and research on the risk management of EPC general contracting projects of large photovoltaic power stations in combination with specific project cases.

[Keywords]large photovoltaic power station; EPC general contracting project; risk management

通过研究大型光伏电站EPC总承包项目的风险管理,一方面,有助于人们准确把握此类项目的特点,了解项目中潜在的主要风险以及风险的识别与评估方法。另一方面,本文可以在为相关研究人员给予相应理论参考的同时,也为大型光伏电站EPC总承包项目有效落实风险防控工作,提供必要的实践指导与帮助。

1 项目概况

本文以市规划建设的光伏电站EPC总承包项目为例,该项目包括电缆敷设、光伏组件安装与场区内光伏阵列基础安装等内容。规划容量为200 MWp,本期建成50 MWp,共安装198000块单位容量为535 Wp的光伏组件,实际装机容量为50.49 MWp。该大型光伏电站EPC总承包项目中,涉及的项目内容众多,为提高大型光伏电站EPC总承包项目及其风险管理力度,在充分考量实际接入情况后,该项目升压站为110 kV,根据装机容量和升压站等级,根据装机容量与开关站电压等级,本工程为Ⅱ级,工程规模为大型,开关站建筑物级別为2级,结构重要性系数为1.0,建筑物设计使用年限为50年。……

登录APP查看全文

猜你喜欢

风险管理
探讨风险管理在呼吸机维护与维修中的应用
对企业合规风险管理的思考
房地产合作开发项目的风险管理
财务会计风险管理研究
护理风险管理在冠状动脉介入治疗中的应用
我国商业银行风险管理研究
发达国家商业银行操作风险管理的经验借鉴
本地化科技翻译的风险管理
审判风险管理初探
风险管理在工程建设中的应用