简支伸缩式结构在机翼总装型架中的应用研究
2021-01-12上官敬益张炜田经纬白黎明
上官敬益 张炜 田经纬 白黎明




[摘 要]文章简要阐述了一种大型立式机翼总装型架,该型架的上梁安装在能够横向移动的简支伸缩梁和机构上,为零部件装配和机翼起吊提供充足的空间,还允许将其与自动制孔设备集成并与型架集成。
[关键词]机翼总装;型架;简支梁;横向移动
[中图分类号]V262.4 [文献标志码]A [文章编号]2095–6487(2021)11–00–02
Research on Application of Simply Supported Telescopic
Structure in Wing Assembly Frame
Shang guan Jing-yi, Zhang Wei, Tian Jing-wei, Bai Li-ming
[Abstract]This article briefly describes a large vertical wing assembly frame. The upper beam of the frame is installed on a simply supported telescopic beam and mechanism that can move laterally, providing sufficient space for component assembly and wing lifting. It also allows it to be integrated with automatic hole-making equipment and integrated with the frame.
[Keywords]wing assembly; frame; simply supported beam; lateral movement
在飞机机翼总装型架设计时,为方便翼梁、翼肋和蒙皮的等部件的上架安装及完成装配后翼盒下架吊运,可以采用简支伸缩式上梁结构提供安装通路。该上梁结构包括刚性强、可重复使用的定位器,通过这些定位器安装机翼的后梁交点组件,型架的高度方向与前梁垂直。整个上梁和附属定位器可以横向移动,行程约1.2 m。上梁的移动通过自动化装置控制,并与型架自动制孔设备协调。
1 机翼装配工艺
机翼装配流程可总结如下:前梁上架并定位→梁间肋在型架上大致定位→后梁上架并定位→肋与前、后梁装配,形成骨架→下蒙皮上架定位,制孔→拆卸下蒙皮并去毛刺→上蒙皮上架定位,制孔→拆卸上蒙皮并去毛刺→重新上架下蒙皮并与前、后梁和肋装配→重新上架上蒙皮并与前、后梁和肋装配→机翼垂直起吊下架
2 采用简支伸缩顶梁结构的总装型架
传统的固定梁机翼总装型架,如图1所示,通常采用大型钢结构,为保证工装框架上梁刚度,通常将上梁与立柱以及下梁组成一个平面框架,机翼翼盒的装配在这个框架中完成。翼盒的大型部件如前梁、后梁、翼肋及壁板等上架安装时,必须吊运至合适位置然后再横向移动到位安装,翼盒装配完成后采用专用吊挂先横向脱离装配型架,然后才能吊运下架。……
