三维规划验收系统设计研究
2019-10-21李南江程良勇
李南江 程良勇



摘 要:为了破解传统规划验收手段效率低、难以全覆盖等相关难题,首次提出设计与研发三维规划验收系统。根据项目的《建设工程规划许可证》内容构建三维模型及技术指标,运用本项目竣工实测数据构建三维模型及自动计算经济指标,直观的进行审查和对比分析,快速审查出建筑外立面、屋顶结构、道路、绿化、出入口、停车位等要素不一致的地方,辅助规划执法部门进行竣工验收。在项目建设完全通过验收后,自动将项目竣工验收成果更新至整个城市三维模型库中,保持城市三维数据的现势性。
关键词:三维设计;规划验收;建设工程
中图分类号:TP311.52;TP391.7 文献标识码:A 文章编号:2096-4706(2019)05-0018-03
Abstract:In order to solve the difficult problems such as low efficiency and full coverage of the traditional planning method of acceptance,according to the content of “Construction Project Planning License” of the project,three-dimensional models and technical indicators are constructed,and three-dimensional models and economic indicators are automatically calculated by using the measured data of the project completion, which can be examined and analyzed intuitively. Quickly examine the inconsistencies of building facades,roof structures,roads,greening,entrances and exits,parking spaces and other elements,and assist planning and law enforcement departments to complete the acceptance. After the project construction has passed the acceptance,the results of the project completion acceptance will be automatically updated to the whole citys three-dimensional model library to maintain the current situation of the city's three-dimensional data.
Keywords:three-dimensional design;planning acceptance;construction engineering
0 引 言
傳统的规划验收,大多根据竣工测量单位提供的工程竣工验收测量报告,去现场校对,并采集照片的方式来进行,而且建设项目的资料或信息大都以二维图纸(包括各种电子版本文件)记录:
一是待审查的部位覆盖不全,容易漏掉关键部位;二是由于时隔久远或经多次改造,会导致实际的现状情况与保存的资料或信息不符,查阅起来十分的不方便,从而对建筑设施的维护与项目的改造造成了很大的困难;三是工程验交阶段信息管理系统还是存在工程信息数据量大不能及时共享、工程信息数据完备性未得到有效验证、工程实体信息与工程资料信息部分不相符、竣工交付标准缺失等问题,致使建设单位/政府监督机构在工程竣工验收与交付等环节出现工作效率较低的问题;四是现今的城市建设日新月异,三维数字城市数据库更新内容量大、更新周期长、投入人力物力巨大。……