高速铁路简支箱梁的快速施工技术

2019-07-08班玄耀

价值工程 2019年16期

班玄耀

摘要:为了减少施工时间,提高施工区域及其周围的安全性,针对既有桥梁工程的确定性体系,通过对黄河特大桥的施工方案的优化,探索黄河特大桥的施工工艺和施工组织方法,对各个施工阶段进行研究,以缩短工期为目标,最大程度提升工程综合效益。通过对黄河特大桥的混凝土简支箱梁快速施工方案研究,把节段预制胶接方案修改成了支架现浇方案,最大限度的缩短了施工占用的时间,减轻了对周围环境的影响,降低或避免了长时间高空作业,减少了施工危险等,实现了黄河特大桥的快速施工以及提升经济效益。

Abstract: In order to reduce the construction time and improve the safety of the construction area and its surroundings, the construction process and construction method of the Yellow River Bridge are explored by optimizing the construction plan of the Yellow River Bridge for the deterministic system of the existing bridge project. Research on each construction stage is carried out to shorten the construction period and maximize the comprehensive benefits of the project. Through the research on the rapid construction scheme of the concrete simply supported box girder of the Yellow River Bridge, the prefabricated gluing scheme of the section was modified into the stent cast-in-place scheme, which minimized the time occupied by the construction, reduced the impact on the surrounding environment, reduced or avoid long-time high-altitude operations, and reduced construction risks, etc., so the rapid construction of the Yellow River Bridge is achieved and the economic benefits is improved.

关键词:快速施工;方案优化;工程综合效益;施工组织

Key words: rapid construction;program optimization;engineering comprehensive benefits;construction organization

中图分类号:U445.4                                      文献标识码:A                                  文章編号:1006-4311(2019)16-0106-03

0  引言

高速铁路建设与发展对我国经济发展起到了重要的纽带和动脉作用,高速铁路运输的低碳、节能功能明显以及产生的同城效应,已经成为我国现代化交通体系的主干。如何在建设期科学评价控制性桥梁工程对工程建设综合效益的影响,优化桥梁工程施工方案和管理[1-2],组织桥梁工程快速施工,配套先进施工技术和工艺确保工程施工质量[2-3],采用合理的机械综合配套技术及管理,提高工作效率[4-5],是当前高速铁路桥梁施工中应重点研究和解决的理论与实践课题,也是促进中国高铁施工技术与管理创新和引领的重要途径。

本文主要通过对项目的工程综合效益分析,以缩短工期来提升综合效益,进行了施工方案和施工技术的优化,采用了新设备,完善了施工组织管理,最后缩短了工期,降低了成本,质量和环境也得到了很好的控制。……