楼板结构早拆模板体系中早拆立柱可行性有限元研究

2019-06-07杨梦虹刘利先

森林工程 2019年4期
关键词:有限元

杨梦虹 刘利先

摘 要:為验证楼板结构早拆模板体系中立柱在混凝土强度达到设计强度的100%(养护龄期28 d)前还可再拆除,在考虑立柱的实际刚度,且在支撑楼板为弹性支座的假定下,运用ansys线性弹性分析模块,对拆除底模、主楞和次楞等构件后的施工阶段,仅由楼板和立柱组成的慢速时变结构,采用离散性时间冻结法,取出结构工作中的若干最不利状态(即各拆柱阶段)研究拆柱方法的可行性。结果表明:①对ansys模型中均匀布置的立柱间距从1.3 m至1.8 m,均得到楼板相同位置处的立柱轴力最小,拆柱位置即为轴力最小处的立柱;②选取5、7 d分别为第一、第二拆柱阶段,在拆除立柱后,得到拆柱前后立柱轴力增幅最大不超过20%,楼板第一主应力增幅最大不超过30%。结论:施工中应控制合理立柱间距和拆柱时间,并对楼板和立柱的应力、位移实时监测,才能保证拆柱后施工安全,实现立柱早拆。

关键词:楼板结构;早拆模板;早拆立柱;有限元

中图分类号:TU741.1 文献标识码:A   文章编号:1006-8023(2019)04-0112-07

Finite Element Study on the Feasibility of Early Demolition of Columns

in Early Demolition Formwork System of Floor Structure

YANG Menghong1, LIU Lixian1,2*

(1.School of Architecture and Engineering, Kunming University of Science and Technology, Kunming 650500;

2.Yunnan Cloud-wisdom Engineering Test & Appraisal Co. Ltd, Kunming 650500)

Abstract:In order to verify the slab structure, the columns in the early demolishing formwork system can be removed before the concrete strength reaches 100% of the design strength (28 days of concrete curing age). Considering the actual stiffness of the column and the elastic bearing of the supporting slab, using the ansys linear elastic analysis module, in the construction stage after the removal of the bottom mold, the main raft, the secondary raft and other components, in the slow time-varying structure consisting only of slabs and columns, the discrete time freezing method is adopted to take out some of the most unfavorable conditions in the structure work (i.e., each stage of demolition) to study the feasibility of the method of demolition. Results show: ①For the evenly arranged columns in the ansys model, the spacing between the columns is from 1.3 meters to 1.8 meters, and the axial force at the same position of the floor is the smallest. The position of the column to be removed is the column with the smallest axial force. ②Day 5 and day 7 are selected as the first and second demolition stages respectively. After the column is removed, the axial force increase of the column before the demolition is not more than 20%, and the maximum increase of the first principal stress of the floor is not more than 30%. Conclusion: the reasonable column spacing and column removal time should be controlled during construction, and the stress and displacement of the floor and column should be monitored in real time to ensure the safety of the post-column construction and realize the early demolition of the column.

Keywords:Floor structure; early demolishing formwork; early demolition of column; finite element

0 引言

据统计,我国现浇混凝土工程中,传统模板工程造价约占现浇混凝土工程总造价的30%,用工量约占总用工量的35%,工期约占总工期的50%。模板的一次性投入、利用和循环效率成为影响建筑结构工程质量和工程成本的重要内容。开发和应用早拆模板体系,有利于加速模板的循环使用速度和周期,减少模板的一次性投入,世界各国都在积极采用和发展早拆模板技术[1]。

1 楼板结构早拆模板原理

登录APP查看全文

猜你喜欢

有限元
基于扩展有限元的疲劳裂纹扩展分析
非线性感应加热问题的全离散有限元方法
TDDH型停车器制动过程有限元分析
新型有机玻璃在站台门的应用及有限元分析
基于I-DEAS的履带起重机主机有限元计算
基于有限元模型对踝模拟扭伤机制的探讨
10MN快锻液压机有限元分析
磨削淬硬残余应力的有限元分析
基于SolidWorks的吸嘴支撑臂有限元分析
箱形孔轧制的有限元模拟