BIM技术在工程质量管理中的应用分析
2018-09-21胡文言余涛张莹
胡文言 余涛 张莹


摘要:随着机电工程的快速发展社会对工程质量管理的要求越来越高,BIM技术作为工程质量管理的变革工具之一,其应用越来越广泛。本文以某工程质量管理中BIM技术的应用为研究对象,通过阅读大量文献资料,采用定性比较法和案例分析法分析工程质量管理中存在的问题和BIM技术理论,系统探讨BIM技术在工程质量管理中应用的手段,并探讨了该技术在工程事前、事中、事后质量管理中的应用,得出BIM技术可提高工程质量管理的水平、效率的结论。
Abstract: With the rapid development of mechatronics engineering, society has higher and higher requirements for project quality management. BIM technology is one of the revolutionary tools of engineering quality management and its application is more and more extensive. This article takes the application of BIM technology in a project quality management as the research object. Through reading a large number of documents, this paper uses qualitative analysis and case analysis methods to analyze the problems existing in the project quality management and BIM technology theory, and systematically explores the application methods of BIM technology in project quality management, and discusses the application of this technology in pre-project, in-project and post-project quality management, and concludes that BIM technology can improve the level and efficiency of project quality management.
关键词:BIM技术;工程质量管理;施工
Key words: BIM technology;project quality management;construction
中图分类号:TU17 文献标识码:A 文章编号:1006-4311(2018)27-0021-03
1 工程质量管理中存在的问题
1.1 工程质量管理简介
工程施工质量管理主要包括事前控制、事中控制、事后控制三部分,事前控制又包括设计交底与图纸会审、施工组织设计的会审、质量计划的会审和质量生产要素配置会审,事中控制主要包括技术作业交底、施工工序质量控制、中间产品质量控制、分部和分项工程质量控制以及工程变更的审查五大部分。事后控制主要包括四大部分,分别是单位工程和单项工程的审查、竣工质量验收、工程质量评定和技术质量文档审核。前一环节的工程质量会影响下一环节的工程质量,各环节之间相互独立又相互关联。图1是工程施工质量管理过程。
1.2 工程质量管理中存在的问题
1.2.1 施工人员专业技能和素质不足
我国机电工程中一线施工人员的专业技能和责任心对工程质量、进度起着决定性的作用,工程质量管理人员应高度重视一线施工人员的管理,严格把控工程施工人员的施工质量。……
