试论如何加强风电项目工程建设过程控制探析

2018-04-25沈达

科技创新与应用 2018年11期
关键词:问题策略

沈达

摘 要:随着经济的飞速发展,社会对能源的需求量与日俱增,现有的电力大都依靠化石燃料例如天然气、煤炭、石油等。但是这些化石燃料在生产能源时会产生大量的二氧化硫、二氧化碳等有害物质,对环境造成极大的危害。于是世界对新能源的开发提出了政策性指导、太阳能、风能、潮汐能等可再生清洁能源受到了越来越多的关注,目前我国已经确立了可再生能源替代化石能源的思路。风能作为技术最成熟且经济可能的清洁能源,将成为焦点。近些年来,我国大型风电工程建设项目的数量也呈现出稳步增长的趋势。文章将结合风电项目的特点对强化风电项目工程建设过程控制的有效策略进行探究。

关键词:风电项目工程;过程控制;问题;策略

中图分类号:TM614 文献标志码:A 文章编号:2095-2945(2018)11-0111-02

Abstract: With the rapid development of economy, the social demand for energy is increasing. Most of the existing electricity depends on fossil fuels such as natural gas, coal, oil and so on. However, these fossil fuels will produce a large number of harmful substances such as sulfur dioxide, carbon dioxide and other harmful substances in the production of energy, which will cause great harm to the environment. Therefore, the world has put forward policy guidance for the development of new energy, solar, wind, tidal energy and other renewable clean energy has received more and more attention. At present, China has established the idea of renewable energy as a substitute for fossil energy. Wind energy, as the most mature and economically possible clean energy, will be the focus. In recent years, the number of large-scale wind power projects in China has also shown a steady growth trend. This article will use the wind power project characteristic to strengthen the wind power project construction construction process control the effective strategy to carry on the exploration.

Keywords: wind power project engineering; process control; problem; strategy

前言

近些年來,我国风力发电规模一直保持着较高的增幅,但是由于风电工程项目建设过程的影响因素较多,加之技术、经验缺乏,因此必须从前期计划、预算和中期建设过程控制等多方面入手,保障风电项目工程建设的顺利开展。

1 过程控制的内涵分析

过程控制也叫做程序控制或是同期控制,一般情况下可以通过整个过程的前、中、后分成前馈控制、过程控制以及反馈控制。其中过程即可看作一种程序,它既是一种计划,要求对项目实施过程中的各项工作以及涉及到的部门、人员以及责任、项目进度、所需的校核、审批、记录、存贮、报告等进行分析、研究和计划。……