【Abstract】After the working face of the mine is finished, in order to protect the surrounding laneway, the way of retaining the section to protect the coal pillar is often adopted. Although it has a certain protective effect on the roadway, it is very unfavorable to the recovery of coal resources and the management of the roof during the period of the support. After a long period of practice and technical reform, the working face ending without coal pillar has been realized,and it improves the reliability of the roof of the working face during dismantling the support.
【关键词】无煤柱结束;顶板预加固;煤炭回收率
【Keywords】 ending without coal pillar; roof pre- reinforcement; recovery rate of the coal
【中图分类号】TD263.3 【文献标志码】A 【文章编号】1673-1069(2018)03-0183-02
1 引言
新三矿162706工作面煤层走向N20oW-N53oW,倾向NE,煤层厚度平均5.2m,煤层较稳定。因受f2断层影响,断层顶板交面线往下盘方向约15m范围内煤层变薄,该范围内平均煤厚约3.1m。工作面平均埋深447m,直接顶为砂质页岩,老顶为中粒砂岩,工作面走向315m,倾斜长度平均75m,煤层倾角6°,可采储量16.2万吨。以往工作面结束均采用保留煤柱形式进行结束,工作面在距联络巷或集中回风巷20m左右位置结束,既不安全又浪费煤炭资源,此次无煤柱结束工作面技术是在以往沿空留巷技术基础上。根据2706工作面顶板特点以及以往经验进行可行性分析,决定在新三矿162706工作面实施无煤柱结束工作面技术,可大大提高煤炭回收率和提高工作面结束期间的安全系数,通过顶板预加固,使得工作面结束期间顶板得到有效支撑,为拆除设备提供了安全保证。
2 工作面结束联络巷加固设计
为了保证工作面能够正常推到联络巷,在工作面距联络巷不小于50m时,提前对联络巷进行加固支护。162706联络巷下帮钢带端头和距钢带端头1.1m位置打设两排锚索并用工字钢连锁,间距0.6m。……