浅析工程施工阶段隐性成本的控制方法

2012-10-19付忠兴

城市建设理论研究 2012年28期
关键词:控制对策建筑工程

付忠兴

摘要:由于我国建筑市场发展的特点,有相当一部分施工企业是从包工头开始发展而来的,多数企业没有长远的发展规划,经济活动行为具有短期性特征。许多建筑企业在成本控制方面往往存在观念不强,手段不多,措施不力或者说“心有余而力不足”的现象,即便是重视成本核算,也往往是局限于看得见的成本控制或者称为显性成本控制,而对于隐性成本地控制则显得无从下手,或者往往只停留在定性的描述上,而无法对工程成本形成全方位的核算与控制,导致成本控制流于形式,没有从根本上解决隐性成本这一“效益漏斗”的问题。本文就针对建筑工程项目施工阶段隐性成本的主要影响因素提出具体的控制措施。

Abstract: because of the characteristics of the development of market of building of our country, have quite one part enterprise is from the labor contractor began development, most enterprises have no long-term development planning, economic activities with short-term characteristics. Many construction corporations in terms of cost control often have the sense is not strong, method is not much, inadequate measures or " weak" phenomenon, even if attention is the cost accounting, it is often limited to the visible cost control or known as the dominant cost control, and to the recessive cost control is unable to start, or often just stay at the qualitative description, unable to form a full range of project cost accounting and control, cost control becomes a mere formality, not fundamentally solve the hidden costs of this " benefit funnel " problem. This article aims at the construction phase of project project construction cost is the main factor to influence the specific control measures.

关键词:建筑工程 项目施工阶段 隐性成本 控制对策

1.设置合理的项目组织形式

现阶段建筑工程项目的组织形式主要有以下几种:

第一,工作队式组织形式。这种项目管理组织形式是由项目经理以及在企业内部抽离的相关人员组成的工作队。这种组织形式的独立性很强,项目部成员在工程建设期间与原部门无组织关系。因此,企业的职能部门处于服从地位。这种组织形式适用于那些工期要求很紧的项目,大型项目,以及对工种和部门配合度要求比较高的项目。

第二,部门控制式项目组织形式。这种项目组织形式是按职能原则建立而成的。此形式把项目授予给某一个专业部门,由此部门领导和其他部门的人组建工作队,组合负责实施。……

登录APP查看全文

猜你喜欢

控制对策建筑工程
建筑工程技术管理模式创新探索
造价预结算在建筑工程中的审核方式及应用实践
建筑工程预结算审核中常见问题分析与处理
建筑工程管理策略探讨
隔震技术在建筑工程中的应用及发展趋势
建筑工程预决算审核中常见问题分析与处理
我国高校财务风险管理与控制对策研究
论企业经营中的风险管控
焊接专业实训教学成本控制的对策
基于公共卫生传染病控制对策分析