梁柱节点不同混凝土强度等级的施工
2012-10-15魏军昌童旬宁
魏军昌 童旬宁
【摘要】在钢筋混凝土结构中,高层建筑框架结构的梁柱节点比较复杂,由于荷载组合及内力计算的结果,要求同一层的竖向结构(柱、墙)混凝土强度等级高于水平结构(梁、板)的混凝土强度等级。钢筋混凝土框架结构,水平施工缝通常留于柱脚,柱顶若要留水平施工缝则应留于梁底。若同层的竖向构件和水平构件的
混凝土同时浇捣,则柱顶不留施工缝...... 关键词:节点; 混凝土强度; 现场施工
【 abstract 】 in reinforced concrete structure, frame structure of the high-rise building joints is more complex, due to load combination and internal force calculation results, the vertical structure required the same layer (column, wall) concrete strength level higher than the level structure (beam, plate) strength grade of concrete. Reinforced concrete frame structure, level construction seam usually stay in column feet, if want to leave a level tops construction joints shall be left at the end of a load. If the vertical component tree and the level of the component Concrete and poured dao, is not the tops of the construction joints...
Keywords: node;strength of concrete; Site construction
中图分类号: TU74 文献标识码: A 文章编号:
1 梁柱节點不同强度等级混凝土的常见施工方法
1.1 不同等级混凝土邻接面的留设 在钢筋混凝土结构中,高层建筑框架结构的梁柱节点比较复杂,由于荷载组合及内力计算的结果,要求同一层的竖向结构(柱、墙)混凝土强度等级高于水平结构(梁、板)的混凝土强度等级。钢筋混凝土框架结构,水平施工缝通常留于柱脚,柱顶若要留水平施工缝则应留于梁底。若同层的竖向构件和水平构件的混凝土同时浇捣,则柱顶不留施工缝。
1.2 梁柱不同强度等级混凝土分别浇捣的施工 根据高层建筑多数使用商品混凝土或现场搅拌站泵送浇捣的情况,柱节点核心区的混凝土浇捣方法为:不管柱顶留或不留施工缝,均应先用塔吊吊斗或混凝土泵输送柱等级的混凝土就位,分层振捣,在楼面梁板处留出45°斜面。在混凝土初凝前,随之泵送浇筑楼面梁板的混凝土。采用这种方法浇捣楼层柱、墙、梁、板混凝土时,应重点控制高低强度等级混凝土的邻接面不能形成冷缝,故宜在柱顶梁底处留设施工缝,以缩小节点核心区高强度等级混凝土浇捣时间,避免高低强度等级混凝土邻接面形成冷缝。……