鲁地拉水电站地下厂房系统监测成果分析

2012-10-15王洪岩郭心锐张岳

城市建设理论研究 2012年25期
关键词:锚杆围岩变形

王洪岩 郭心锐 张岳

摘要:鲁地拉水电站地下厂房布设的安全监测系统,以围岩位移和锚杆应力为重点,通过施工期大量的监测数据,及时反映了围岩施工期的工作性态,掌握洞室在采用新奥法开挖施工过程中的围岩基本性状及处理决策提供了重要依据,确保了工程的安全可靠,提高施工技术。

关键词:地下厂房;围岩位移;锚杆应力;锚索拉力;安全监测

Abstract:Ludila Hydropower Station Underground Powerhouse layout of safety monitoring system, to the surrounding rock displacement and stress of bolt as the focus, through the construction of a large number of monitoring data, timely reflect the working state of surrounding rock during construction, grasp the caverns in the new Austrian Tunneling Method in the process of excavation of rock mass characteristics and treatment decision-making provided important basis, ensure the engineering safety and reliability, improving the construction technology.

Key word:Underground powerhouse Displacement of surrounding rock Bolt stress Tension force of anchor cable Safety monitoring

中图分类号:TK01+2文献标识码:A文章编号:2095-2104(2012)

1工程概況

鲁地拉水电站位于云南省大理州宾川县与丽江地区永胜县交界的金沙江干流上,是金沙江中游河段规划一库八级水电开发方案中的第七个梯级电站,上接龙开口水电站,下邻观音岩水电站。总布置为碾压混凝土重力坝、河床坝身泄水、右岸地下厂房方案,枢纽由左右岸挡水坝、泄水建筑物(河床溢流表孔、底孔)、右岸引水发电系统组成。坝顶高程1228.00m,最大坝高140m,坝顶长622m(含进水口坝段)。

地下厂房内布置6台机组,开挖尺寸为267×29.8×77.2m,最大跨度为29.8m,岩壁梁跨度27.6m;主变洞(长×宽×高)为203.4×19.8×24m;尾水调压室为阻抗式,采用“两机一室一洞”的布置型式,尾水调压室尺寸184×24×75m;尾调后接三条尾水洞,断面采用圆洞型,直径20.7m,洞内设计流速3.83m/s,尾水洞长度分别为419.82、502.50、567.60m。地下厂房、主变洞、尾调三大洞室平行布置,轴线方向均为NE25°,水平埋深190~460m,垂直埋深达140~356m。围岩岩性以J2s—S1青灰色~深灰色变质砂岩夹J2s—S2灰黑色泥质粉砂岩为主,其间穿插有少量正长岩脉,岩脉与围岩接触较好,多呈熔结接触,少量呈裂隙接触。……