谈通信工程建设全过程管理及有效措施

2012-10-15姚立新

城市建设理论研究 2012年20期
关键词:通信工程措施分析

姚立新

摘要:伴随着改革开放的不断深入和发展,通信事业也如雨后春笋般蓬勃发展起来,新形势下对通信工程建设也提出了更高的要求。而如何完善通信工程建设管理,满足通信工程建设需求,是我们目前所亟待解决的问题。本文从通信工程的特点出发,以全过程管理为切入点,讨论和分析了在通信工程建设的全过程中,建设项目工程管理的作用。同时还提出了关于质量调控和建设管理的具体的建议和措施,希望能对如何提高通信工程建设全过程管理水平,提高参考和借鉴。

关键词:全过程;通信工程;分析;措施

Abstract: with the deepening of reform and opening up and development, communication business also springing up flourished, under the new situation of communication engineering construction also put forward higher request. And how to perfect communication engineering construction management, satisfying the communication engineering construction demand, is we are issues that need to be resolved. This article from the communication engineering features, with a whole process management as the breakthrough point, discussion and analysis of communication in the whole process of the project construction, construction project management role. Also put forward concerning the quality control and construction management of the specific Suggestions and measures, in hopes of how to improve the communication engineering construction process management level, and improve for reference.

Keywords:The whole process; Communication engineering; Analysis; measures

中图分类号:K826.16文献标识码:A 文章编号:

一、通信工程建设全管理的特征

在整个工程建设过程中,包括投标、招标及整个工程的实施和结算,都可以委托拥有一定资历的相关单位全权代理。招标事宜由招标代理完成。工程管理由监理公司全权接任,对工程造价及工程质量进行控制,并由相关人员负责工程进度的调度和安排。可由建设方指派工程联系人。工程结算和审核工作可委托专门的工程造价咨询单位负责。而针对通信工程建设,则具有以下特征:

1、 特殊性强

和一般工程相比,通信工程要涉及到特殊的技术点,所以不具有普遍性和广泛性。对于多数咨询单位好代理单位,基本上都没有配置掌握和熟知通信技术的专业的技术人才。

2、差异性大

由于主要设备材料用途和性能上的不同,也使价格上存在着较大的差异。……