关于基坑支护技术应用的探讨
2012-06-04冯海银何骆峰
冯海银何骆峰
【摘要】近几年来,高层建筑的迅速兴起,促进了深基坑支护技术的发展。但是现在的城市建筑间距很小,有的基坑边缘距已有建筑仅数十米、甚至几米、给基础工程施工带来很大的难度。复合土钉支护是从土钉墙的基础上发展起来的,它在一定程度上克服了土钉墙的缺点,是一种应用更加广泛的基坑支护新技术
【关键词】建筑;基础支护:施工
【 abstract 】 in recent years, the rapid rise of high-rise buildings, and promote the development of the technology of deep foundation pit support. But now the city building spacing is small, some foundation pit construction from the edge has only dozens of meters, or even a few meters, to bring a lot of infrastructure of difficulty. Composite soil nailing support from the soil nailed wall developed on the basis of, to a certain extent, it overcome the shortcomings of the soil nailed wall, is a more extensive application of the foundation pit supporting new technology
【 key words 】 architecture; Foundation pit supporting: construction
中图分类号:TU74文献标识码:A 文章编号:
1工程概况
工程概述
我地区某在建的5#地块南2幢37层的住宅楼和2幢22层住宅楼及楼层间2层地下车库组成。本基坑工程由住宅楼和地下车库组成,基本撑足红线,施工场地比较弑小。住宅楼距离基地引线相刑宽松,普遍区域与红线距离超过8. 3m,局部区域距离较小,约为6.9m,地下车库衷两两侧基本上撑足红线,东侧与红线的最小距离约为4 0:m,东侧有道路和供水管线需要保护,间距5-IOm西侧与红线距离仅为3 0mm。
2基坑支护技术应用
土方开挖 :基坑面积较大,故上方开挖时对拱坑进行合理分区或分段组织施工。基坑挖土应遵循先施工锚杆(支撑)后开挖的原则,采用虢式、分层、抽条、对称开挖,围护端正铺杆(史撑)器露时间应控制在20h/内,开挖面围I护墙无锚杆(支撑)暴露长度不人于20m。
采用盆式开挖时,基坑周边边坡留土范围不小于1Orn,中部开挖至基底时应及时浇筑垫层,待巾部挚层形成并达到设计强度要求,分块、抽条开挖基坑削边的边坡,并及时浇筑分块垫层,最后浇筑贯通整个垫层;……