浅析钢筋工程算量基本方法
2012-06-04王楠
王楠
摘要:工程造价的直意就是工程的建造价格。工程造价专业是为了培养具有良好的科学素养,掌握工程造价的基础知识,熟悉工程造价全过程的管理,经过严格的实践技能训练,以工程施工阶段工程造价的编制与控制为重点的高级技术应用型人才。其中钢筋工程量计算在整个工程造价中起着举足轻重,在具体计算中需把握:图纸的理解、现场实践经验、规范与图集的学习、计算规则的运用,本文结合作者多年的工作经验浅析钢筋工程算量基本方法,仅供参考。
关键词:钢筋;梁
Abstract: the engineering cost of construction of the project is straight meaning price. Project cost is to develop professional with good scientific literacy, and master the basic knowledge of engineering cost, familiar with the whole process of engineering cost management, through the strict practice skills training, to project construction phase of the project cost control is to focus on the establishment and the advanced technology applied talents. In the whole quantity of steel construction cost calculation plays an important, in specific calculation to grasp: drawing understanding, field practice experience, the standard and the atlas of learning, calculation rules apply, with the author many years of work experience reinforced engineering amount is shallow basic method, only supplies the reference.
Keywords: reinforced; beam
中图分类号:TU74文献标识码:A 文章编号:
0 引言
在以前的房屋结构中,多以砖混结构为主,单位工程用钢量很少,计算起来也较简单。而今,随着城镇化建设进程的加快,土地日趋紧张,房屋建设规模朝高、大方向发展,钢筋在其中起到了重要作用。在工程计量与计价工作中,钢筋工程量的计算是一个非常重要的环节,它所耗用的工时及占工程造价的比重举足轻重。
一、钢筋工程量计算规则 1、钢筋工程,应区别现浇、预制构件、不同钢种和规格,分别按设计长度乘以单位重量,以吨计算。 2、计算钢筋工程量时,设计已规定钢筋塔接长度的,按规定塔接长度计算;设计未规定塔接长度的,已包括在钢筋的损耗率之内,不另计算塔接长度。钢筋电渣压力焊接、套筒挤压等接头,以个计算。 3、先张法预应力钢筋,按构件外形尺寸计算长度,后张法预应力钢筋按设计图规定的预应力钢筋预留孔道长度,并区别不同的锚具类型,分别按下列规定计算: (1)低合金钢筋两端采用螺杆锚具时,预应力的钢筋按预留孔道长度减0.35m,螺杆另行计算。……