市政排水改造工程施工应注意问题探讨

2012-06-04康纯

城市建设理论研究 2012年13期
关键词:沟槽图纸监理

康纯

【摘要】市政给排水改造工程是针对现有城市给排水管网的老化、无法满足现状、排水需求、消防要求、雨污分流以及与相关给排水专项规划的衔接等问题的解决方式,一般同道路改造同时进行。因此,加强对市政排水改造工程的施工质量控制,对消除工程质量缺陷、确保排水管道工程质量,具有十分重要的意义。本文主要谈谈市政排水改造工程施工应注意问题,以及如何加强质量控制。

【关键词】市政排水改造工程 施工

Abstract: municipal water supply and drainage reconstruction project for the existing urban drainage network of aging, can not meet the status quo, drainage requirements, fire requirements, the rain and sewage diversion and related solutions to the problem of the convergence of drainage special plan, generally the sameroad reconstruction at the same time. Therefore, the strengthening of municipal drainage reconstruction project construction quality control, the elimination of the engineering and quality defects to ensure that the engineering quality of the drainage channels, has great significance. In this paper, talk about the construction of the Municipal Drainage Improvement Project should pay attention to the problem, and how to enhance quality control.

Key words: Municipal Drainage Improvement Project construction

中图分类号:S276文献标识码:A 文章编号:

一、市政道路排水改造施工中的注意事项

1、排水工程

1)原排水管网接入

道路施工遵循由下而上,先深后浅的施工顺序。城市排水系统改造在沟槽开挖埋设管道的同时,还需考虑原有管道的临时排水及永久接入等问题。大道原排水系统为雨污合流排水沟涵。在施工街巷及单位出入口通道前,将新埋设的雨、污支管接入到两边人行道上,以便排水收集管的驳接,避免重复开挖。两侧单位出入口低于人行道标高的,在接口处增设水沟或雨水进水口。为保证新增设雨、污水管端头与支路原有排水管顺畅驳接,新接管径不小于原有排管管径。

2)公用地下管线避让

在管线施工遇到矛盾时,遵循临时管线避让永久管线、小管线避让大管线、压力管线避让重力自流管线、可弯曲管线避让不可弯曲管线的原则。管线穿越时对公用管线做好支撑维护、黄砂填埋及对接口进行混凝土包裹等保护措施。……

登录APP查看全文

猜你喜欢

沟槽图纸监理
一种具有多形式钢片结构的四季胎
浅谈汽车线束产品图纸管理
一种低噪音的全路况轮胎
看图纸
关于建设工程监理发展趋势的探讨
工程监理管理模式创新探索
沟槽爆破参数优化及成本分析
Influence of machining parameters on groove surface morphology of condenser for heat column
酒店室内装修图纸深化设计浅析
推行输变电工程设计监理的必要性思考