基于工程造价的合理确定控制探讨

2012-06-04李永洁

城市建设理论研究 2012年13期
关键词:工程造价

李永洁

摘要:建设工程造价是贯穿于建设全过程的管理,即从设计任务书,投资估算开始至项目竣工结算为止的整个过程。建设项目工程造价的合理确定和有效控制是工程建设管理的重要内容。始终贯穿于工程造价管理的全过程。只有合理确定工程造价,通过有效手段控制好各阶段建设费用,才能达到理想的目的,确保建设项目保质按期完工。

关键词:工程造价 投资估算 设计概算

Abstract: construction engineering cost is throughout the whole process of management in construction, that is, from the design plan descriptions, investment estimation began to project completion and settlement of the whole process so far. Construction project construction cost and the reasonable determination of the effective control of project construction and management is an important content. Run through the whole process of project cost management. Only reasonably determine the engineering cost, through the effective methods to control the construction cost each stage, to achieve the ideal purpose, to ensure the quality of construction projects completed on time.

Keywords: engineering cost investment estimation design budgetary estimate

中图分类号: TU723.3文献标识码:A文章编号:

所谓工程造价的合理确定,就是在建设程序的各个阶段,合理确定投资估算、概算造价、预算造价、合同承包价、结算价、竣工决算价。

1 我国工程造价管理现状

(1)目前我国工程造价管理重点在建设项目实施阶段,只重视建设项目的承包价、实施过程的变更造价以及结算价,而对工程可行性研究阶段和初步设计阶段造价管理没有给予足够的重视,产生这种现象的根源是一些人存在着一个错误的认识,即可行性研究阶段的投资估算和初步设计阶段设计概算是虚拟资金、是准现实的,而在建设项目实施阶段所发生的资金才是真实的。

(2)工程造价管理一直重视造价的控制,轻视造价的合理确定,没有处理好二者的关系,使我们陷入了一个死循环,我们一直在寻找控制工程造价的方法,但收效甚微,因而出现了头疼医头,脚疼医脚的片面现象。很少有人提到工程造价失控的一个重要原因是我们没有足够重视可行性研究阶段和初步设计阶段工程造价的合理确定。……

登录APP查看全文

猜你喜欢

工程造价
建筑工程造价预结算审核探讨
建筑工程造价预结算审核与实践举措
建筑工程预算在工程造价控制中的作用
民用建筑工程造价超预算与解决方法
土建工程管理中工程造价预结算审核的应用
输电线路工程造价控制
土木工程管理与工程造价的有效控制
如何加强工程造价管理有效的控制工程造价
建筑工程预算在工程造价控制中的作用
工程造价之旅