刘大华

[摘要]本文针对110kV及以下无人值班变电站一、二设备的特点以及与常规变电站的不同,认为不能按常规站的经验来选择无人值班变的蓄电池容量,而应该在对站内直流经常负荷、事故负荷、冲击负荷等进行详尽分析、统计的基础上,重新计算蓄电池组的个数及容量。本文介绍了其计算过程,供各位同行参考。

[关键词]无人值班变电站; 蓄电池容量计算

[Abstract] Due to the characteristics and the difference from the conventional transformer substation of primary and secondary equipments of the unattended substation no higher than 110 kV, it is believed that the selection of unattended substation battery capacity should not follow the normal experience, but recomputer the number and capacity of the battery pack based on the detailed analysis and statistics of the dc regular load, accident load, impact load detailed inside the station. This paper will introduces the calculation process for your reference.[Keywords] the unattended substation; battery capacity calculation

中图分类号: TM912.9文献标识码:A文章编号:

现在不论是对已运行常规变电站的改造,还是新建的110kV变电站,都是按无人值班模式进行设计、运行,其二次设备大多采用综合自动化系统。而综合自动化系统与常规二次设备的区别就在于它集保护、控制、测量、信号等装置于一体,取消了传统的红、绿灯监视以及中央信号装置,实现了对变电站的“四遥”操作。

另外110kV、35kV断路器目前一般选用SF6断路器,10kV断路器则选用真空断路器或中置柜,均配置弹簧操作机构。变电站内没有电磁操作机构,而弹操机构的合闸电流远远小于电磁操作机构,因此可以将弹操机构列入控制负荷。这样一来变电站内就没有了动力负荷,全部为控制负荷,其直流系统就可以取消合闸母线,而只设置控制母线。

通过上面的简述,可以看出110kV及以下无人值班变电站的直流负荷比常规站要少一些,并且没有什么冲击负荷,因此其蓄电池组的容量应该重新进行计算并确定,而不应依据常规变电站的经验来选择。鉴于各类没计手册上对该部分内容涉及不深,本文就先分析、统计站内各种直流负荷,在此基础上介绍其计算过程。……

登录APP查看全文

猜你喜欢

变电站
变电站巡检机器人控制系统设计
关于变电站五防闭锁装置的探讨
超高压变电站运行管理模式探讨
谈实时以太网EtherCAT技术在变电站自动化中的应用
220kV户外变电站接地网的实用设计
智能变电站与综自变电站区别综述
变电站,城市中“无害”的邻居
国外电厂和变电站接地设计概述
移动式变电站之应用
变电站中保护和控制单元的设计