盖挖法施工过程质量控制的几点体会

2012-04-23张伟

城市建设理论研究 2012年35期
关键词:质量控制

张伟

摘要:盖挖法适用于路面交通不能长期中断的道路下修建地下车站或区间隧道,它作为一种新的施工方法,其软土基坑盖挖法施工中开挖及支撑、中间立柱与围护结构的差异沉降等关键技术与控制要点没有成熟经验,这些都给施工带来了难度。本文就靖海公园站的具体施工经验对施工过程中的质量控制做出了一些归纳总结,为今后类似的施工提供可以借鉴的经验。

关键词:盖挖;盖挖顺筑;质量控制

Abstract: the cover WaFa suitable for road traffic cannot long interruption of the road building underground station or interval tunnel, it as a new kind of construction method, the soft soil foundation pit cover WaFa construction in the excavation and support, intermediate post and retaining structure of the differential settlement on the key technology and the control points are not ripe experience, these are brought to the construction difficulty. In this paper the jing sea park station of specific construction experience of quality control during construction process made some summarizes for future similar construction to provide some useful experience.

Keywords: cover dig; Cover the dig up; Quality control

中图分类号:TU71文献标识码:A 文章编号:2095-2104(2012)

1、工程概述及工法介绍

1.1靖海公园站工程概况

靖海公园站位于上马墩路与江海东路交界处,2号线车站沿上马墩路纵向(东-西)布置,与设于沿江海东路布置的3号线形成“T”型换乘,车站位于城市主干道下,覆土3m。上马墩路规划道路红线为30m,江海东路规划道路红线为68m,江海东路上部设有分离式双向6车道江海高架。车站西北侧设置连接2号线与3号线的联络线,同时对于联络线与车站结构之间部分地块拟与车站结构同步施工以进行商业开发,覆土3m。其中上马墩道路为城市次干道,江海东路为城市主干道,同时江海东路上有双向分离式江海高架。现场实地勘察,交通流量大,尤其是交通高峰期,车辆、电动车、自行车、行人流量均很大。

图1.2.1车站周边环境示意图

车站整体采用明挖法施工,局部节点采用盖挖顺筑法施工。即2号线车站西端下沉顶板及高架桥下部分节点考虑交通疏解及管线迁改需要,采用盖挖顺筑法施工。……

登录APP查看全文

猜你喜欢

质量控制
如何加强土地测绘质量控制
射线无损检测在石油化工压力管道的质量控制
高层建筑主体结构施工技术及质量控制研究
浅析建筑工程施工管理
浅谈机车总风缸的制作质量控制
血型实验室的输血检验的质量控制与输血安全探究
沥青路面施工技术及质量控制
关于高层建筑施工技术要点以及质量控制的思考
浅析水利工程施工质量问题及质量控制措施
浅谈在公路桥梁施工环节的质量管理及控制