【Abstract】:Inorder tostudytheimpactofconstructionloadsonexistingshieldtunneld,thisstudytakestheconstruction of the tie beamattherailway-related pilelocation in ContractSectionA1of thefirstphase projectof Fuzhou Binhai New City Expressway as acase.The finite element software midas GTS NX was employed for numerical simulation,aiming to analyze the additional stress imposed on the shalow-buried existing shield tunnel and the consequent lining displacement during the tie beam construction process.Based on the simulation results, anassessment was made todetermine whether the tie beam construction scheme complies with relevant specifications,thereby ensuring the safe operation of the existing tunnel.
【Keywords】:tie beam;constructionload;shield tunnel
随着城市基础设施建设推进,新建构筑物不可避免与既有结构产生交叉,新建工程施工对既有建筑影响的评估对于既有构筑物安全运营至关重要。关国轻采用简化的非连续模型数值模拟方法研究既有盾构隧道在桩基施工与承载阶段所受的影响。苏稚寅等2研究上海北横通道工程V标段 15.5m 超大直径盾构隧道施工得出,施工过程中既有桩基、地层和盾构穿越表现出显著的相互作用影响。肖飞分析了盾构隧道下穿施工对既有铁路的影响,并评估了“门式隔离桩 + 地层注浆”方案的加固效果。
本文以福州市滨海新城高速公路一期工程A1合同段涉铁桩位置系梁施工为研究背景,使用midasGTSNX有限元软件,对浅埋既有盾构隧道处地面系梁施工进行数值模拟,计算施工对盾构产生的附加荷载值及在系梁施工时盾构结构及周边土体的位移变形,评估施工方案对既有隧道运营安全的影响。
1工程概况
滨海新城高速公路一期工程A1合同段起于福州市长乐区鹤上镇北山村,与鹤上收费站出口匝道形成鹤上北山互通,接规划福州滨海高速二期终点。高架跨越峡漳线,沿地铁6号线走廊带下穿福州绕城高速,终于上余村,顺接泽竹互通连接线。路线起止里程K3+079~K6+426 ,全长 3.35km ,全宽 33.5m ,设计车速 80km/h ,双向6车道,包括H匝道 538.4m,A 匝道289.8m,B 匝道 685.7m 、主线桥 394.7m 、莲柄港中桥60m 、南洋西河大桥 150m 、1*旱桥 276.4m.2# 旱桥80m,3* 旱桥 323m 、4旱桥 336m 。
3# 旱桥 3# 系梁底标高在地面以下,系梁施工时桩基尚未承载,系梁自重由地面承载。……