南沙港区陆域软土基坑支护方案设计与实现
2021-09-23刘树明王四根朱峰
刘树明 王四根 朱峰



摘 要:为了有效消减建设于软土地基上的建筑物整体工后沉降,充分提高后续软土地基中基坑开挖的稳定性,依托广州港南沙港区办公楼软土基坑搅拌桩墙支护工程,进行了基坑支护方案的选型,分别對“先预压软基+后搅拌桩墙支护”与“不预压软基支护”2种备选工程方案进行了对比,同时采用直剪强度参数和φ=0法计算了地基的抗隆起承载力,并进行了对比分析。结果表明:对于研究项目,先预压可以显著提升土体的抗剪指标近一倍,实现搅拌桩 墙深度和置换率的降低,从而降低工程造价;工程实测数据表明,计算中考虑φ 会显著增加抗隆起安全系数,从而降低设计安全性;计算中考虑内摩擦角φ 对土体抗力具有积极贡献,可以有效减少桩基布置密度。研究结果可以为工程中的土体设计参数选取提供重要依据,同时为类似基坑工程设计提供实用化参考案例。
关键词:地基基础工程;基坑支护;搅拌桩墙;φ=0法;抗隆起
中图分类号:U652.7 文献标识码:A DOI:10.7535/hbgykj.2021yx04012
Design and implementation of soft soil foundation pitsupporting scheme in Nansha Port land area
LIU Shuming,WANG Sigen,ZHU Feng
(CCCCFHDIEngineeringCompanyLimited,Guangzhou,Guangdong510230,China)
Abstract:Inordertoeffectivelyreducetheoverallpostconstructionsettlementofbuildingsonsoftsoilfoundationandfullyimprovethestabilityoffoundationpitexcavationinthesubsequentsoftsoilfoundation,thefoundationpitsupportingschemewasselectedbasedonthesoftsoilfoundationpitmixingpilewallsupportingprojectofNanshaportofficebuildinginGuangzhouport.Thetwoalternativeengineeringschemesof"preloadingsoftfoundationfirstandthenmixingpilewallsupporting"and"nonpreloadingsoftfoundationsupporting"werecomparedrespectively.Atthesametime,thedirectshearstrengthparametersandφ=0methodwereusedtocalculateandanalyzetheupliftbearingcapacityofthefoundation.Theresultsshowthatthepreloadingcansignificantlyimprovetheshearstrengthofsoilbyalmost100%inthisproject,andreducethedepthandreplacementrateofmixingpilewall,whichresultsinthedecreaseoftheprojectcost;theengineeringmeasureddatashowsthatthesafetyfactorsagainsttheupheavalcanbesignificantlyincreasedbyconsideringtheinternalfrictionangleφintothecalculation;theinternalfrictionangleφ hasapositivecontributiontothesoilresistanceandcaneffectivelyreducethepilefoundationlayoutdensity.Theresearchresultscanprovideanimportantbasisfortheselectionofsoilparamet
软土地基基坑设计中往往需要进行地基加固,基坑地基加固一般分为结构物地基永久加固和施工期间被动区地基临时加固2种类型。房建和市政行业软土基坑设计中,由于工期紧、排水预压对周边场地影响、行业习惯等原因,一般都没有事先对地基进行整体处理,而主要采用被动区局部临时性加固,结构物则采用桩基础,由于地基没有整体加固,常见结构物底板或承台与地基脱空现象。……