大型沉管管节浮运航道适航特性建模分析

2021-09-23陈宏伟朱峰

河北工业科技 2021年4期

陈宏伟 朱峰

摘要:为确保沉管隧道在航道中长期浮运作业的安全性与可靠性,依托深中通道工程备选预制厂方案,建立珠江口局部区域二维水流数学模型,在实测水文资料验证的基础上,通过模型计算揭示了浮运航道的水动力变化特征,开展航道范围内横流、纵流的变化特点分析。分析结果表明:工程实施后,龙穴港池水域的潮流流速普遍较弱,南沙四期港池水域流速变化较小,口门区水域环流较弱,为南沙港池作为防台锚地提供有利条件;浮运航道在小潮和中潮期间的最大横流可以近似认为不超过0.5 m/s;小潮和中潮期间的最大纵流不超过1.0 m/s,可以满足通航对水流条件的要求。但是大潮期间水流条件不满足浮运对水流流速的要求。研究结果可以为沉管浇筑区选址和浮运航道选线提供重要的参考依据和技术支撑。

关键词:航道工程;浮运航道;水流流态;流速分布;数值模拟

中图分类号:U612.33文献标识码:ADOI: 10.7535/hbgykj.2021yx04011

Modeling and analysis of navigable characteristics of

large immersed tube elements of floating channel

CHEN Hongwei1,ZHU Feng2

(1.Guangzhou Port Company Limited, Guangzhou,Guangdong 510100, China; 2.CCCCFHDI Engineering Company Limited, Guangzhou,Guangdong 510230, China)

Abstract:In order to ensure the safety and reliability of longterm floating operation of immersed tunnel in the channel, the 2D mathematical model of the flow in Pearl River estuary was established based on the alternative prefabrication plant scheme of the Shenzhen Zhongshan river crossing channel project. On the basis of the verification of measured hydrological data, the hydrodynamic variation characteristics of floating channel were revealed through model calculation, and the characteristics of cross flow and longitudinal flow change within the channel were analyzed. The results show that after the implementation of the project, the tidal current velocity in Longxue harbor basin is generally weak, the change of current velocity in Nansha phase Ⅳ harbor basin is small, and the circulation in the mouth area is weak, which can provide favorable conditions for typhoon prevention anchorage; the maximum cross current of floating channel is less than 0.5 m/s during neap and middle tide; the maximum longitudinal current velocity in the period of neap tide and mid tide is less than 1.0 m/s, which can meet the requirements of floating transportation. However, the current conditions during spring tide can not meet the requirements of floating transportation. The research results can provide reference and technical support for site selection of immersed tube casting area and route selection of floating channel.

Keywords:waterway engineering; floating channel; flow pattern; velocity distribution; numerical simulation

大型构件预制化是现代海洋工程中最为可靠的实施方案,也是目前最为先进的工程理念。随着预制构件的异形化和大型化发展,预制构件运输对设备和环境的要求也愈发苛刻,航道逐渐成为制约预制构件发展的重要因素。航道普遍存在的水深不足、宽度有限、水流条件复杂等问题使大型预制件的浮运面临着严峻的工程调整和重大的安全隐患。

大量学者针对珠江口航道的浮运及通航特性开展了深入研究。冯海暴……