建筑工程中“不可抗力”的风险分担

2021-08-16郭娥

关键词:建筑工程

郭娥

【摘  要】建筑工程施工中时刻伴随着“不可抗力”产生的风险,经常造成严重的经济损失。因此,在建筑施工中,要想避免因“不可抗力”造成的风险,就必须重视对其的分析和应对。此外,在处理“不可抗力”风险的过程中,要以签订的合同为基础,重视风险管理,制订相应的应急措施;购买工程保险,可以减少“不可抗力”带来的风险损失。论文就建筑工程中“不可抗力”的概念解读为切入点,提出了“不可抗力”风险的分担策略,并结合实际工程案例,提出对工程中“不可抗力”风险承担的思考,将风险转化为更大的经济利益。

【Abstract】The risk of "force majeure" is always accompanied by serious economic loss in construction. Therefore, in architectural engineering, in order to avoid the risk caused by "force majeure",  we must pay attention to the analysis and response of "force majeure" risk. In addition, in the process of dealing with the risk of "force majeure", we should pay attention to risk management and formulate corresponding emergency coping measures on the basis of the signed contract, and purchase engineering insurance can reduce the risk loss caused by "force majeure". In this paper, the concept of "force majeure" in construction engineering is interpreted as the starting point, the coping strategy of "force majeure" risk sharing is put forward, and the thinking of "force majeure" risk bearing in engineering is put forward in combination with actual engineering cases, so as to turn risk into greater economic benefits.

【关键词】建筑工程;“不可抗力”;风险分担

【Keywords】architectural engineering; "force majeure"; risk sharing

【中图分类号】F416.9                                           【文献标志码】A                                                 【文章编号】1673-1069(2021)08-0150-02

1 引言

建筑工程中的“不可抗力”,是指合同当事人在签订合同时不可预见,在合同履行过程中不可避免且不能克服的自然灾害和社会性突发事件,如地震、海啸、瘟疫、骚乱、暴动、战争等。“不可抗力”事件由于超出雙方当事人和合同约定的责任范围,会降低项目和合同的绩效。不能盲目地将“不可抗力”的风险强加给承包商。在建设项目实施的过程中,如果发生“不可抗力”事件导致建筑工程受损,会妨碍承包商履行施工合同,也必须按约定提供具体资料。此外,为减轻“不可抗力”造成的项目损失以及由此产生的经济损失,不应部分或全部由承包商承担。

2 “不可抗力”风险分担应对策略

2.1 签订合理公约,划分风险范围

一般而言,具有经验的工程承包商会非常重视工程合同签订和风险防范。……

登录APP查看全文

猜你喜欢

建筑工程
建筑工程技术管理模式创新探索
造价预结算在建筑工程中的审核方式及应用实践
造价预结算在建筑工程中的审核方法
建筑工程预结算审核中常见问题分析与处理
建筑工程管理策略探讨
建筑工程电气接地安装
建筑工程预算在工程造价控制中的作用
隔震技术在建筑工程中的应用及发展趋势
新型建筑材料在建筑工程中的应用
建筑工程预算在工程造价控制中的作用