软土地区基坑开挖诱发邻近盾构隧道水平位移的简化算法
2021-05-17徐日庆申硕董梅程康
徐日庆 申硕 董梅 程康



摘 要:為探究软土地区基坑开挖对于邻近隧道水平位移的影响,首先,分析了软土地区基坑开挖卸载引起盾构隧道水平位移的变形机理;其次,收集了国内软土地区邻近地铁盾构隧道开挖基坑的工程实例,利用随机森林算法对影响隧道最大水平位移的因素进行了重要度排序,并对影响因素进行了统计分析,提出一相对简便且方便广大工程从业人员使用的半经验公式,可直接用于隧道在邻近基坑开挖下的最大水平位移的预测. 通过与所收集到文献中已发表的工程实际案例实测数据的对比,对经验公式进行了验证,验证了所提公式的准确性与适用性. 参数分析表明:隧道最大水平位移随基坑开挖体量的增大近似呈对数增大,增速逐渐放缓. 隧道水平位移受基坑围护结构水平位移影响较大,两者之间近似呈线性正相关. 隧道最大水平位移与基坑隧道间距离呈负相关关系,当距离小于两倍开挖深度时,基坑开挖对隧道的影响较大. 基于提出的公式,对基坑开挖对隧道的影响范围进行了分区,结果可为类似工程提供一定的理论指导.
关键词:岩土工程;基坑;盾构隧道;水平位移;
中图分类号:TU473.2 文献标志码:A
A Simplified Calculation Method for Horizontal Displacement
of Adjacent Shield Tunnel Caused by Excavation in Soft Soil Area
XU Riqing1,2,SHEN Shuo1,2,DONG Mei1,2?,CHENG Kang1,2,3
(1. Research Center of Coastal and Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310058,China;
2. Engineering Research Center of Urban Underground Development of Zhejiang Province,Hangzhou 310058,China;
3. China Railway 11th Bureau Croup Co Ltd,Wuhan 430061,China)
Abstract:To explore the effect of excavation on the horizontal displacement of adjacent tunnels in soft soil area,firstly,the deformation mechanism of horizontal displacement of adjacent tunnels in soft soil area due to excavation is analyzed. Secondly,project cases on excavation of adjacent tunnels in soft soil area are collected. The importance of the factors affecting the maximum horizontal displacement of the tunnel is ranked by the random forest algorithm. Through analyzing the influencing factors statistically,a semi-empirical formula,which is relatively simple and convenient for engineering practitioners,is proposed. It can be directly used to predict the maximum horizontal displacement of the adjacent tunnel under excavation. The accuracy and applicability of the proposed empirical formula is verified by comparing with the measured data of the actual engineering cases published in the collected literature. Parameter analysis shows that: with the increase of excavation geometry,the maximum horizontal displacement of the tunnel increases in an approximate logarithmic relation,but the increasing speed gradually slows down. The horizontal displacement of tunnel is greatly affected by the horizontal displacement of retaining structure. It is approximate linearly correlated with the horizontal displacement of retaining structure. The distance between the excavation and the tunnel has a negative correlation with the maximum tunnel horizontal displacement. Furthermore,when the distance is less than twice the excavation depth,the influence of excavation on the tunnel is greater. Based on the proposed formula,the effect range of excavation on the tunnel is divided into zones,and the results can provide certain theoretical guidance for similar projects.
Key words:geotechnical engineering;excavation; shield tunnel;horizontal displacement
随着我国城市化进程的逐步加速,以地铁为代表的地下空间开发正处于史无前例的高峰. 而以公共交通为导向的开发模式的实施,促进了邻近地铁区域商业中心、居住区的建设,使得邻……