再就业市场提升改造工程项目深基坑施工面临的施工质量安全风险及防范措施
2021-04-28张生浩
张生浩
【摘 要】在深基坑施工阶段,安全风险是影响工程施工的最主要因素,若面临的安全风险因素过大,便有可能导致深基坑施工受到影响,不但会导致工程效益受损,还有可能出现人员伤亡,因此,需要重点防范其中的安全风险。论文首先对深基坑工程进行介绍,之后以再就业市场提升改造工程项目为例,探讨与研究其面临的施工质量和安全风险以及防范措施,希望可以为相关工作人员提供经验参考。
【Abstract】In the construction stage of deep foundation pit, safety risk is the most important factor affecting the construction of the engineering. If the safety risk factors are too large, it may lead to the deep foundation pit construction being affected, which will not only lead to the damage of engineering benefits, but also may lead to Casualties. Therefore, it is necessary to focus on preventing the safety risk. The paper firstly introduces the deep foundation pit engineering, and then takes the re-employment market improvement and renovation engineering project as an example to discuss and study the construction quality and safety risks faced by it and the preventive measures, hoping to provide experience reference for relevant staff.
【关键词】深基坑施工;安全;风险;防范
【Keywords】deep foundation pit construction; safety; risks; prevention
【中圖分类号】TU753 【文献标志码】A 【文章编号】1673-1069(2021)03-0164-02
1 引言
深基坑施工项目中,施工安全风险管理是其中一项重要的工作内容,通过施工质量安全风险管理工作可以及时发现在工程当中存在的安全风险因素,并且科学且合理地制定防范措施,用以有效规避其中可能产生的风险,确保整体工程井然有序地开展,从而使整体工程的竣工质量符合验收标准。
2 深基坑工程介绍
深基坑工程指开挖深度为5m或者5m以上的土方开挖、支护、降水工程类型,此外,若开发深度未超过5m但是其地质条件、周围环境以及地下管线较为复杂,或者影响毗邻建筑安全的基坑土方开挖、支护也可以被称为深基坑工程[1]。在深基坑施工阶段,最为主要的一项要求便是安全,需要由建设单位、监理单位、施工单位、勘察设计单位等方面共同组成安全领导小组,用以全面保证深基坑施工阶段的安全性。工程特点如下:
第一,临时性。深基坑支护体系为临时搭建,其安全储备比较小,同时,具备较大的风险性,深基坑工程施工阶段需要采取相应的安全监测措施,且拥有安全应急措施,以便于在产生安全风险的第一时间予以处理。……