麦垛山煤矿通风系统优化改造
2021-04-20苏明强张伟
苏明强 张伟
摘要:目前麦垛山煤矿矿井风量已接近主要通风机的最大额定风量,风机运行工况已经靠近驼峰点,并且11采区和13采区分区要同时进行生产等问题。针对以上问题,需要对该矿井通风系统进行优化改造,将半煤岩矸石斜井改造为回风斜井,实现矿井通风方式由中央并列式到分区式通风转变,满足矿井的正常生产需要。
关键词:通风系统;优化改造;中央并列式;分区式
中图分类号:TD724 文献标识码:A
Abstract: At present, the air volume of Macquashan Coal Mine has approached the maximum amount of stain of the main ventilator. The wind turbine operation conditions have been close to the hump point, and there is a wind speed speed of the main level return line, and also as a special return line, etc. The problem. In response to the above problems, it is necessary to optimize the mine ventilation system, and transform the semi-coal yarn slanting as a return traveled surface, and the mine ventilation is realized by central concurrently to the partition ventilation transition, meeting the normal production needs of the mine.
Key words: Ventilation system; optimized transformation; central parallel; partition type
矿井通风一直都是煤矿安全环节中的重中之重,可靠的通风系统是保证矿井安全生产的基础[1]。本文以麦垛山煤矿为例,针对其矿井通风中的主要问题,提出有效通风系统优化改造措施,将半煤岩矸石斜井改造为回风斜井,达到11采区和13采区分区式通风的要求,解决矿井通风系统中目前面对的难题。
1 现有通风现状
1.1 通风系统简介
目前,矿井采用中央并列、抽出式通風,在回风立井井口装设两台FBCDZNO 35型轴流式对旋风机,一套运转。矿井为副立井、主斜井、副斜井进风,回风立井回风“三进一回”机械全负压通风布局。
1.2 存在的主要问题
目前矿井通风系统存在的主要问题为:该矿井风量已接近主要通风机的最大额定风量,风机运行工况已经靠近驼峰点;11采区和13采区同采时,矿井要实现分区式通风的要求,针对以上问题,需进行矿井通风系统升级改造,以确保安全生产[2]。
2 通风系统调整整体方案
麦垛山煤矿11采区利用半煤岩矸石斜井改造为回风斜井回风,13采区生产、矿井开拓延伸及采区接续巷道利用回风立井回风,副立井为主要进风井、主斜井为辅助进风井,矿井实现分区式通风。……