[摘    要]文章主要介绍废水提升泵站的控制系统的PLC选型、硬件配置;介绍两用一备水泵循环控制,使3台水泵自动进入备用状态;工作泵事故时,备用泵自动投入;介绍根据液位变化控制水泵的运行数量,使废水提升泵站处于最佳运行状态;节约电能,节约生产运行成本。

[关键词]可编程控制器;液位计;操作员站

[中图分类号]TP273 [文献标志码]A [文章编号]2095–6487(2021)10–00–02

Wastewater lifting pump station control

Liu Man-yuan ,Zhou Jin-xing

[Abstract]The article mainly introduces the PLC selection and hardware configuration of the control system of the wastewater lifting pump station; introduces the dual-use and one standby water pump cycle control, so that 3 water pumps automatically enter the standby state; when a working pump accident occurs, the standby pump is automatically put into use; introduction basis Liquid level changes control the number of pumps in operation, so that the wastewater lifting pump station is in the best operating state; it saves electricity and saves production and operation costs.

[Keywords]programmable controller; level gauge; operator station

1 控制系统设计

废水提升泵站采用计算机系统控制:系统由1套PLC控制站,1台操作员站及1台工业打印机组成;通过工业以太网将PLC控制站与操作员站、打印机连接起来;同时,废水处理中心的管理机也通过工业以太网连接在该系统。

1.1 PLC系统配置

废水提升泵站PLC控制配置:PLC采用西门子S7-300,CPU采用CPU315-2PN/DP,该CPU带有MPI/DP组合接口和工业以太网接口。其中,PLC由以下模块组成:

电源模块:6ES7307-1KA00-0AA0,DC24 V,10 A,同时为站内24 V仪表供电;

主机模块:6ES7315-2EH13-0AB0,1块,配2 M存储卡;

数字量输入模块:6ES7321-1BH02-0AA0,DC24 V,16点模块,3块;

模拟量输入模块:6ES7331-7KF02-0AB0,8点,4~20 mA,2块;

数字量输出模块:6ES7322-1BF01-0AA0,8点,DC24,2 A,继电器输出,1块;

通讯接口模块:CP341-1,1块;该模块主要用于PLC与全厂EMS(能源管理系统)系统通讯;

通过1根11槽的导轨(6ES7390-1AF30-0AA0),将所有模块连接起来。PLC输入输出见表1。

1.2 废水泵控制方案

废水提升泵站设有生活污水池、生产废水池;用于存储生产废水和生活污水;生产废水池尺寸为6 m×5 m×6 m(长×宽×深);生活污水池尺寸为6 m×2.5 m×6 m;

将生产废水输送到废水处理中心,水泵运行有2种方案;

方案一:废水泵采用2用1备模式运行;废水液位达到一定水位后,依次启动2台水泵;然后开始将……