姚阳 娄国川 魏斌



摘 要:为了解CCS水电站压力管道下平段岩体在高压水流作用下的透水性变化情况、变形方式以及岩体裂隙对高压水流长时间冲蚀作用的抵御能力和岩体对高压灌浆的适应性,在压力管道下平段靠近钢衬段位置进行了水力劈裂试验。结果表明:工程运行过程中,在6.3 MPa的水压力作用下,隧洞具有较好的稳定性。但运行时混凝土衬砌段在高内水压力作用下,逐渐贯穿开裂成为透水衬砌,内水压力将作用在周围岩体上,必须通过高压固结灌浆进一步提高岩体质量,围岩灌浆压力至少要达到7 MPa,使其在长期高水头作用下不产生大的扩张变形,避免造成严重后果。为了提高岩体质量,减少内水外渗,在压力管道下平段采用固结灌浆,下平段混凝土衬砌末端设置帷幕灌浆圈,在压力管道混凝土衬砌及钢衬砌段均设计了回填灌浆。工程运行期监测成果表明,压力管道整体运行正常,满足设计要求。
关键词:高水头;压力管道;围岩;水力劈裂;CCS水电站
中图分类号:TV67;TV221.2 文献标志码:A
doi:10.3969/j.issn.1000-1379.2020.12.024
Abstract: In order to understand the permeability change and deformation mode of rockmass under high water pressure, the resistance of rockmass fissure to longterm erosion of high water pressure and the adaptability of the rockmass to high pressure grouting of the lower horizontal section of penstock in CCS Hydropower Station, the hydraulic fracturing test was performed at the lower section of penstock near the steel lining section. Based on the test results, the tunnel will have better stability under the water internal pressure of 6.3 MPa during operation period. However, the concrete lining section gradually penetrates and cracks into permeable lining under the high internal water pressure. The internal water pressure will act on the surrounding rockmass. Highpressure consolidation grouting must be used to further improve the rockmass, and the grouting pressure should reach at least 7 MPa, so that it will not produce large expansion deformation under the longterm high water pressure, and avoid serious consequences. In order to improve the quality of rockmass and reduce internal water seepage, consolidation grouting was used in the lower horizontal section of penstock, curtain grouting ring was set at the end of the concrete lining and backfill grouting was designed in both the concrete lining and steel lining sections. The monitoring results show that the penstock is operating normally during the operation period and has met the design requirements.
Key words: high water pressure; penstock; surrounding rock; hydraulic fracturing; CCS Hydropower Station
水力劈裂是指因水壓力抬高而在岩体或土体中引起裂缝及其扩展的一种物理现象[1-2]。在水利水电工程地质勘测中,应了解工程区岩体在设计水头作用下的物理力学行为。特别是一些高水头电站,当内水压力达到一定数值时水工隧洞的钢筋混凝土衬砌便产生贯穿性开裂,成为透水衬砌,裂隙岩体在高水头压力作用下是否张开,其承载高水头压力的能力如何,直接关系到围岩的稳定性[3-4]。……