CCS水电站调蓄水库库盆开挖设计BIM技术应用
2020-12-30董甲甲郭莉莉陈晓年
董甲甲 郭莉莉 陈晓年



摘 要:CCS水电站调蓄水库天然库容有限,根据电站运行需求,为满足调蓄水库日调节的要求,需对库盆进行开挖以增加足够的库容。在增加一定库容的条件下,开挖量最小是设计优化的目标和重点。CCS水电站调蓄水库库盆的开挖设计是一个反复试算的过程。为提升计算精度与设计效率,采用BIM技术建立库容增量与开挖的参数化三维模型,保证库容前提下,确定最优的开挖方案,对工程实施具有重要的意义。
关键词:调蓄水库;库容;开挖;BIM;CCS水电站
中图分类号:TV222.1 文献标志码:A
doi:10.3969/j.issn.1000-1379.2020.12.023
Abstract:The natural storage capacity of the regulation and storage reservoir of CCS Hydropower Station in Ecuador is limited. According to the operation demand of the power station, in order to meet the requirements of daily regulation of the regulating reservoir, it is necessary to excavate the reservoir basin to increase the sufficient storage capacity. Under the condition of increasing a certain storage capacity, the minimum excavation volume is the goal and key point of design optimization. The excavation design of reservoir basin of CCS Hydropower Station in Ecuador is a trial and error process. In order to improve the calculation accuracy and design efficiency, BIM technology was used to build a parameterized threedimensional model of storage capacity increment and excavation, and the optimal excavation scheme was given under the premise of ensuring the storage capacity, which was of great practical significance for the project implementation.
Key words: regulating reservoir; storage capacity; excavation; BIM; CCS Hydropower Station
1 项目概况
厄瓜多尔CCS水电站系厄瓜多尔政府确定的“国家重点项目”,总装机容量1 500 MW,年发电量88亿kW·h,能够满足该国1/3人口的电力需求。主要建筑物包括首部枢纽、输水隧洞、调蓄水库、压力管道和地下厂房等。
调蓄水库位于Coca河右岸支流Granadillas溪上,由面板堆石坝、溢洪道、导流兼放空洞组成。水库正常蓄水位1 229.50 m,死水位1 216.00 m,调节库容88万m3。根据电站运行要求,调蓄水库为日调节,4 h内水位将从正常蓄水位降到死水位,水位维持在死水位附近15 h,然后5 h内水位由死水位升至正常蓄水位。因正常蓄水位至死水位之间的天然库容仅有51.9万m3,故剩余部分由库盆开挖获得。
2 设计要点分析
为满足调蓄水库日调节的运行需求,需通过库盆开挖得到至少36.1万m3的有效库容(日调节所需库容88万m3减去天然有效库容51.9万m3)。库盆开挖时,只有在正常蓄水位以下、死水位以上的开挖工程量才能计入有效库容。受地形限制,在有效库容开挖的同时,必将伴随着一部分无效的开挖工程量。……