基于ITSRP模型的吕梁市水资源优化配置研究
2020-12-14单义明杨侃吴云
单义明 杨侃 吴云



摘 要:针对区域缺水风险以及水资源配置中的不确定性与复杂性,在传统两阶段随机规划与区间线性规划的基础上,加入鲁棒性优化方法形成区间两阶段随机鲁棒规划(ITSRP)模型,不仅可以用离散的区间数表示水资源配置中的多重不确定性,而且可以实现模型的最优化目标与系统稳定性,提高模型的可靠性。将该模型应用于吕梁市的水资源优化配置中,当模型的鲁棒性因子达到一定值时,不同概率水平下的目标函数值均达到最优,最终得到吕梁市2025年水资源优化配置结果,表明模型具有较好的适用性。
关键词:水资源配置;不确定性;区间两阶段随机鲁棒规划;鲁棒性优化;吕梁市
中图分类号:TV213.9 文献标志码:A
doi:10.3969/j.issn.1000-1379.2020.11.009
Abstract: In view of the regional water shortage risk and the uncertainty and complexity in the allocation of water resources, on the basis of the traditional two-stage stochastic programming and interval linear programming, robust optimization methods were added to form an interval two-stage stochastic robust programming (ITSRP) model. The model could not only express the multiple uncertainties in the allocation of water resources with discrete interval numbers, but also realize the optimization goal and system stability of the model, and improve the reliability of the model. The model was applied to the optimal allocation of water resources in Lyuliang City. When the robustness factor of the model reached a certain value, the objective function values under different probability levels reached the optimal values, and finally the results of the optimal allocation of water resources in Lyuliang City in 2025 were obtained which showed that the model had good applicability.
Key words: water resources allocation; uncertainty; interval two-stage stochastic robust planning; robust optimization; Lyuliang City
水资源优化配置是一个复杂的不确定性问题,很多因子都难以精准预测。近些年来,很多专家学者都对不确定条件下的水资源配置方法进行了研究:Huang等[1]提出一种非精确两阶段随机规划方法,用于不确定性条件下的水资源管理系统,解决水资源分配问题;娄帅等[2]提出一种基于区间直觉模糊集的水资源配置群决策研究方法,提高了流域水资源配置方案的合理性;刘静[3]用多重不确定优化方法有效处理了水质和水资源系统的不确定性和复杂性。很多研究[4-8]采用区间两阶段随机规划方法(ITSP),但该方法在模型的可靠性方面有所欠缺,不能保证在不同概率水平下的目标函数值均达到最优。在水资源配置中,除了以经济效益最大化为目标外,还应该保证配置方案的可行性与可靠性。……
