基于微震监测技术的岩爆特征研究

2020-10-12李立民唐烈先魏军政赵力王家明李玉波

人民黄河 2020年2期

李立民 唐烈先 魏军政 赵力 王家明 李玉波

摘 要:秦岭输水隧洞越岭段岩石掘进机法施工过程中多次出现岩爆风险,对施工人员和设备安全产生了严重威胁。采用微震监测技术进行岩爆预测预报,通过分析微震事件分布特征、频次特征、震级特征等,建立了基于能量指标的岩爆判别方法,工程实例表明整体准确预测率超过80%。结果表明,深埋硬岩隧洞中岩爆风险是完全可以预测的,对于中等及以上岩爆预测效果更加显著,根据预测结果采取相应的预防措施,可在一定程度上降低岩爆的风險。

关键词:隧洞;岩爆;微震监测;防治措施;引汉济渭工程

中图分类号:TV672;U459.6 文献标志码:A

doi:10.3969/j.issn.1000-1379.2020.02.016

Abstract: The risk of rock burst appeared repeatedly and had posed a serious threat to personnel and equipment safety in the tunnel boring machine (TBM) construction process of the summit section of Qinling water conveyance tunnel. In this paper microseismic monitoring technology was used for prediction of rock burst. Through analyzing the distribution, frequency and moment magnitude characteristics of microseismic events, the method to judge rock burst was established based on energy index. And in the engineering project the overall accurate prediction rate was more than 80%. The results show that rock burst is predictable in the deep and hard rock tunnel, and the effect is more significant for medium and above rock burst. According to the predicted results, the risk of rock burst can be reduced to a certain extent through adopting the corresponding preventive measures.

Key words: tunnel; rock burst; micro-seismic monitoring; control measures; Hanjang-to-Weihe River Water Diversion Project

引汉济渭工程秦岭输水隧洞越岭段穿越秦岭山脉和主峰山体,洞线长81.779 km,上覆岩体埋深大于1 100 m,最高达2 012 m,地质条件复杂。正在掘进的岭南TBM施工段和4号施工支洞先后遭遇多次中等-强烈岩爆,伴随爆裂、松脱、剥落或抛掷现象,甚至多次出现大面积垮塌,对施工人员、设备安全造成严重威胁。

岩爆受岩体结构、施工参数等诸多因素的影响,其预测预报相当困难,尚缺乏统一的成熟理论和方法,目前主要有基于特殊地质现象的宏观预测法、岩石力学判据预测法、非线性科学理论预测法、数值模拟法、声发射现场监测法、电磁辐射监测预报法及微震监测预报法等[1]。张政辉等[2]通过室内岩石加卸载试验,探讨分析了岩石在不同应力状态下破坏形式与岩爆的关系。何满潮等[3]通过开展基于岩爆试验模拟系统的真三轴岩石试验,研究了岩石在不同应力状态下的变形和强度特征及岩爆现象。……